Southminster
SMNEast of EnglandManaged by Greater Anglia
How this station is performing
Southminster had 16,756 scheduled stops to Period 7 of 2026-27, about 46 a day. 94.0% of recorded arrivals were within three minutes of the timetable and 1.2% of scheduled stops were cancelled.
Southminster opened on 1 July 1889, 137 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Southminster is the oldest; the next oldest, Burnham-on-Crouch, dates from 1889.
The nearest stations to Southminster are Burnham-on-Crouch (3.4 km south-west), Althorne (Essex) (5.9 km west), North Fambridge (10.7 km west), Rochford (12.8 km south-west) and Southend Airport (13.5 km south-west). 2 stations lie within 10 km in all. Of the five, North Fambridge is the most punctual at 94.6% and Southend Airport the least at 87.9%, with Southminster on 94.0%.
Southminster takes its name from a town called Southminster, home to about 4,828 people, and the station stands 0.3 km from its centre.
For Southminster, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 61.4% of stops arrived within three minutes of the timetable. The strongest was Period 10 of 2024-25, at 99.7%, which is 38.3 percentage points higher. Cancellations peaked at 6.3% of scheduled stops in Period 6 of 2026-27, against 1.2% over the latest 13 periods.
1 of 3 stations of a similar size in East of England are more punctual than Southminster on 94.0%. The comparison group includes North Fambridge (94.6%), Watlington (62.7%) and Littleport (65.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 16,756 | 94.0% | 1.2% |
Operators with their own page for this station are linked to it.
Late train at Southminster? Delay Repay
These operators call at Southminster and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,365 | 61.4% | 0.8% |
| Period 6 of 2026-27 | 765 | 76.7% | 6.3% |
| Period 5 of 2026-27 | 974 | 96.8% | 3.0% |
| Period 4 of 2026-27 | 1,372 | 98.5% | 1.6% |
| Period 3 of 2026-27 | 1,372 | 97.3% | 1.0% |
| Period 2 of 2026-27 | 1,370 | 98.8% | 0.7% |
| Period 1 of 2026-27 | 1,577 | 98.1% | 1.1% |
| Period 13 of 2025-26 | 1,342 | 98.5% | 0.4% |
| Period 12 of 2025-26 | 1,369 | 97.7% | 0.2% |
| Period 11 of 2025-26 | 1,360 | 98.1% | 1.0% |
| Period 10 of 2025-26 | 1,188 | 97.6% | 0.2% |
| Period 9 of 2025-26 | 1,338 | 98.5% | 0.3% |
| Period 8 of 2025-26 | 1,364 | 97.2% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| North Fambridge | 16,531 | 94.6% | 1.1% |
| Watlington | 17,138 | 62.7% | 10.0% |
| Littleport | 17,147 | 65.2% | 9.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out