North Fambridge had 16,531 scheduled stops to Period 7 of 2026-27, about 45 a day. 94.6% of recorded arrivals were within three minutes of the timetable and 1.1% of scheduled stops were cancelled.
North Fambridge opened on 1 July 1889, 137 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, North Fambridge is the oldest; the next oldest, Althorne (Essex), dates from 1889.
The nearest stations to North Fambridge are Althorne (Essex) (4.8 km east), South Woodham Ferrers (5.2 km west), Hockley (5.2 km south), Rochford (7.6 km south) and Battlesbridge (8.4 km west). 8 stations lie within 10 km in all. At 94.6%, North Fambridge is more punctual than every one of them; the best of the five, Rochford, manages 88.4%.
North Fambridge takes its name from a Village called North Fambridge, home to about 867 people, and the station stands 0.9 km from its centre.
For North Fambridge, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 70.4% of stops arrived within three minutes of the timetable. The strongest was Period 10 of 2024-25, at 99.4%, which is 29.0 percentage points higher. Cancellations peaked at 8.2% of scheduled stops in Period 6 of 2026-27, against 1.1% over the latest 13 periods.
1 of 3 stations of a similar size in East of England are more punctual than North Fambridge on 94.6%. The comparison group includes Southminster (94.0%), Clacton-on-Sea (95.1%) and Watlington (62.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 16,531 | 94.6% | 1.1% |
Operators with their own page for this station are linked to it.
Late train at North Fambridge? Delay Repay
These operators call at North Fambridge and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,365 | 70.4% | 0.7% |
| Period 6 of 2026-27 | 549 | 77.4% | 8.2% |
| Period 5 of 2026-27 | 974 | 96.4% | 2.9% |
| Period 4 of 2026-27 | 1,368 | 98.3% | 1.5% |
| Period 3 of 2026-27 | 1,372 | 96.8% | 0.9% |
| Period 2 of 2026-27 | 1,370 | 98.2% | 0.7% |
| Period 1 of 2026-27 | 1,577 | 97.3% | 1.1% |
| Period 13 of 2025-26 | 1,342 | 97.9% | 0.4% |
| Period 12 of 2025-26 | 1,368 | 97.1% | 0.1% |
| Period 11 of 2025-26 | 1,356 | 97.9% | 1.0% |
| Period 10 of 2025-26 | 1,188 | 96.6% | 0.2% |
| Period 9 of 2025-26 | 1,338 | 98.1% | 0.2% |
| Period 8 of 2025-26 | 1,364 | 97.0% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southminster | 16,756 | 94.0% | 1.2% |
| Clacton-on-Sea | 15,982 | 95.1% | 1.0% |
| Watlington | 17,138 | 62.7% | 10.0% |