Southease
SEESouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Southease had 13,621 scheduled stops to Period 7 of 2026-27, about 37 a day. 84.5% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Southease opened on 1 September 1906, 120 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Glynde is the oldest (1846) and Bishopstone (Sussex) the newest (1938), with Southease in between.
The nearest stations to Southease are Glynde (4.2 km north-east), Newhaven Town (4.4 km south-east), Lewes (4.5 km north), Newhaven Harbour (4.9 km south) and Bishopstone (Sussex) (6.8 km south-east). 9 stations lie within 10 km in all. Of the five, Bishopstone (Sussex) is the most punctual at 87.8% and Lewes the least at 80.8%, with Southease on 84.5%.
Southease takes its name from a Village called Southease, home to about 49 people, and the station stands 0.8 km from its centre.
Across the whole run of data, the weakest four-week period for Southease was Period 6 of 2025-26, at 81.0%, some time before the latest year. The strongest was Period 3 of 2023-24, at 92.3%, and the two are 11.3 percentage points apart.
1 of 3 stations of a similar size in South East are more punctual than Southease on 84.5%. The comparison group includes Micheldever (65.6%), Shalford (Surrey) (78.7%) and Swale (90.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 13,621 | 84.5% | 1.5% |
Operators with their own page for this station are linked to it.
Late train at Southease? Delay Repay
These operators call at Southease and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,013 | 85.3% | 1.5% |
| Period 6 of 2026-27 | 1,047 | 82.4% | 1.0% |
| Period 5 of 2026-27 | 1,027 | 85.4% | 1.1% |
| Period 4 of 2026-27 | 1,040 | 82.8% | 2.0% |
| Period 3 of 2026-27 | 1,052 | 85.9% | 2.4% |
| Period 2 of 2026-27 | 1,043 | 86.8% | 3.1% |
| Period 1 of 2026-27 | 1,193 | 82.0% | 1.7% |
| Period 13 of 2025-26 | 1,133 | 91.5% | 0.6% |
| Period 12 of 2025-26 | 1,046 | 83.9% | 2.2% |
| Period 11 of 2025-26 | 1,044 | 84.2% | 0.7% |
| Period 10 of 2025-26 | 907 | 84.3% | 0.9% |
| Period 9 of 2025-26 | 1,046 | 81.6% | 1.0% |
| Period 8 of 2025-26 | 1,030 | 82.7% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Micheldever | 13,651 | 65.6% | 2.5% |
| Shalford (Surrey) | 13,712 | 78.7% | 6.4% |
| Swale | 13,835 | 90.6% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out