Shalford (Surrey)
SFRSouth EastManaged by Great Western Railway
How this station is performing
Shalford (Surrey) had 13,712 scheduled stops to Period 7 of 2026-27, about 38 a day. 78.7% of recorded arrivals were within three minutes of the timetable and 6.4% of scheduled stops were cancelled.
Shalford (Surrey) opened on 20 August 1849, 177 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Guildford is the oldest (1845) and Farncombe the newest (1897), with Shalford (Surrey) in between.
The nearest stations to Shalford (Surrey) are Guildford (2.7 km north), Chilworth (2.9 km east), London Road (Guildford) (2.9 km north), Farncombe (3.2 km south-west) and Godalming (4.8 km south-west). 10 stations lie within 10 km in all. At 78.7%, Shalford (Surrey) is less punctual than all of them; the best of the five, London Road (Guildford), manages 86.8%.
Shalford (Surrey) is named after Shalford, a Village, home to about 4,180 people, but the station stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for Shalford (Surrey) was Period 9 of 2024-25, at 59.9%, some time before the latest year. The strongest was Period 2 of 2023-24, at 92.1%, and the two are 32.2 percentage points apart. Cancellations peaked at 13.7% of scheduled stops in Period 9 of 2024-25, against 6.4% over the latest 13 periods.
2 of 3 stations of a similar size in South East are more punctual than Shalford (Surrey) on 78.7%. The comparison group includes Micheldever (65.6%), Southease (84.5%) and Swale (90.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 13,712 | 78.7% | 6.4% |
Operators with their own page for this station are linked to it.
Late train at Shalford (Surrey)? Delay Repay
These operators call at Shalford (Surrey) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,004 | 72.3% | 4.2% |
| Period 6 of 2026-27 | 1,051 | 72.9% | 9.4% |
| Period 5 of 2026-27 | 1,077 | 72.1% | 9.3% |
| Period 4 of 2026-27 | 1,076 | 78.0% | 10.4% |
| Period 3 of 2026-27 | 1,011 | 78.6% | 8.0% |
| Period 2 of 2026-27 | 1,071 | 84.1% | 4.5% |
| Period 1 of 2026-27 | 1,229 | 84.8% | 3.4% |
| Period 13 of 2025-26 | 1,152 | 89.5% | 2.9% |
| Period 12 of 2025-26 | 1,072 | 86.2% | 5.7% |
| Period 11 of 2025-26 | 935 | 84.3% | 6.0% |
| Period 10 of 2025-26 | 931 | 79.5% | 7.8% |
| Period 9 of 2025-26 | 1,041 | 70.4% | 4.8% |
| Period 8 of 2025-26 | 1,062 | 67.6% | 7.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Micheldever | 13,651 | 65.6% | 2.5% |
| Southease | 13,621 | 84.5% | 1.5% |
| Swale | 13,835 | 90.6% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out