Southbury
SBULondonManaged by London Overground
How this station is performing
Southbury had 25,472 scheduled stops to Period 7 of 2026-27, about 70 a day. 93.4% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Southbury opened on 1 October 1891 and closed to passengers on 1 October 1909. It reopened on 21 November 1960, 66 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Southbury is the newest; the oldest, Ponders End, opened in 1840.
The nearest stations to Southbury are Bush Hill Park (1.4 km south-west), Ponders End (1.4 km south-east), Brimsdown (1.7 km north-east), Enfield Town (1.8 km west) and Enfield Chase (2.6 km west). 48 stations lie within 10 km in all. Of the five, Enfield Town is the most punctual at 95.7% and Brimsdown the least at 86.4%, with Southbury on 93.4%.
In London, Southbury ranks 50th of 332 ranked stations. Its 93.4% is 4.6 percentage points better than the area median of 88.8%.
For Southbury, the weakest four-week period in the data is a recent one: Period 4 of 2026-27, when only 91.0% of stops arrived within three minutes of the timetable. The strongest was Period 2 of 2023-24, at 97.7%, which is 6.7 percentage points higher.
2 of 3 stations of a similar size in London are more punctual than Southbury on 93.4%. The comparison group includes Turkey Street (92.9%), Bromley North (99.2%) and Sundridge Park (99.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 25,472 | 93.4% | 1.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,750 | 92.9% | 1.7% |
| Period 6 of 2026-27 | 1,791 | 92.2% | 2.3% |
| Period 5 of 2026-27 | 2,050 | 93.7% | 1.9% |
| Period 4 of 2026-27 | 1,719 | 91.0% | 2.8% |
| Period 3 of 2026-27 | 2,034 | 92.1% | 1.7% |
| Period 2 of 2026-27 | 2,061 | 94.5% | 0.6% |
| Period 1 of 2026-27 | 2,341 | 94.3% | 2.4% |
| Period 13 of 2025-26 | 1,935 | 95.2% | 1.2% |
| Period 12 of 2025-26 | 2,011 | 94.4% | 1.5% |
| Period 11 of 2025-26 | 2,052 | 96.3% | 1.7% |
| Period 10 of 2025-26 | 1,684 | 95.0% | 2.7% |
| Period 9 of 2025-26 | 2,033 | 91.4% | 1.7% |
| Period 8 of 2025-26 | 2,011 | 91.3% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Turkey Street | 25,612 | 92.9% | 2.5% |
| Bromley North | 25,313 | 99.2% | 0.5% |
| Sundridge Park | 25,245 | 99.4% | 0.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out