GTR at Southampton Airport Parkway
All trains at Southampton Airport ParkwayGTR across BritainSouth East
How this operator is doing here
GTR had 737 scheduled stops at Southampton Airport Parkway in the 13 periods to Period 7 of 2026-27, 1% of the station's total. 66.7% of recorded arrivals came within three minutes and 7.5% of stops were cancelled.
GTR trains at Southampton Airport Parkway also serve Eastleigh (2.2 km north-east, 58.4% on time, 7.6% cancelled), St Denys (3.6 km south-west, – on time, – cancelled), Woolston (5.8 km south, 84.5% on time, 7.6% cancelled), Southampton Central (5.9 km south-west, 84.3% on time, 6.9% cancelled), Sholing (6.0 km south, – on time, – cancelled) and Netley (8.5 km south, – on time, – cancelled), which are the stations on its network closest to Southampton Airport Parkway.
Within 30 km of here, GTR runs best at Woolston, 5.8 km south (84.5%), and worst at Fratton, 26.6 km south-east (73.2%).
The busiest GTR station within 30 km of Southampton Airport Parkway is Havant, 28.8 km east, with about 159 scheduled stops a day.
GTR at Southampton Airport Parkway has slipped sharply. 66.7% of stops came within three minutes of the timetable in the latest 13 periods, 5.0 percentage points worse than the 71.7% recorded in the 13 before. Cancellations fell to 7.5% of scheduled stops from 10.8%, which is 3.3 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 57 | 71.4% | 14.0% |
| Period 6 of 2026-27 | 57 | 55.6% | 5.3% |
| Period 5 of 2026-27 | 56 | 48.1% | 7.1% |
| Period 4 of 2026-27 | 60 | 56.4% | 6.7% |
| Period 3 of 2026-27 | 54 | – | – |
| Period 2 of 2026-27 | 54 | – | – |
| Period 1 of 2026-27 | 63 | 76.3% | 4.8% |
| Period 13 of 2025-26 | 66 | 73.3% | 9.1% |
| Period 12 of 2025-26 | 60 | 69.1% | 8.3% |
| Period 11 of 2025-26 | 60 | 83.3% | 10.0% |
| Period 10 of 2025-26 | 30 | – | – |
| Period 9 of 2025-26 | 60 | 69.1% | 5.0% |
| Period 8 of 2025-26 | 60 | 63.2% | 5.0% |
Other operators at Southampton Airport Parkway
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 45,852 | 68.4% | 3.2% |
| CrossCountry | 10,942 | 60.9% | 4.2% |
| Great Western Railway | 333 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out