On time, last 13 periods66.7%Whole station: 67.0%
Cancelled7.5%Whole station: 3.5%
Scheduled stops737Of 57,864 at the station

How this operator is doing here

GTR had 737 scheduled stops at Southampton Airport Parkway in the 13 periods to Period 7 of 2026-27, 1% of the station's total. 66.7% of recorded arrivals came within three minutes and 7.5% of stops were cancelled.

GTR trains at Southampton Airport Parkway also serve Eastleigh (2.2 km north-east, 58.4% on time, 7.6% cancelled), St Denys (3.6 km south-west, – on time, – cancelled), Woolston (5.8 km south, 84.5% on time, 7.6% cancelled), Southampton Central (5.9 km south-west, 84.3% on time, 6.9% cancelled), Sholing (6.0 km south, – on time, – cancelled) and Netley (8.5 km south, – on time, – cancelled), which are the stations on its network closest to Southampton Airport Parkway.

Within 30 km of here, GTR runs best at Woolston, 5.8 km south (84.5%), and worst at Fratton, 26.6 km south-east (73.2%).

The busiest GTR station within 30 km of Southampton Airport Parkway is Havant, 28.8 km east, with about 159 scheduled stops a day.

GTR at Southampton Airport Parkway has slipped sharply. 66.7% of stops came within three minutes of the timetable in the latest 13 periods, 5.0 percentage points worse than the 71.7% recorded in the 13 before. Cancellations fell to 7.5% of scheduled stops from 10.8%, which is 3.3 percentage points fewer.

Period by period

60%80%2023-242024-252025-262026-27Period 11 of 2024-25: 77.8%Period 13 of 2024-25: 74.5%Period 3 of 2025-26: 74.5%Period 4 of 2025-26: 62.7%Period 5 of 2025-26: 64.2%Period 6 of 2025-26: 75.5%Period 7 of 2025-26: 72.7%Period 8 of 2025-26: 63.2%Period 9 of 2025-26: 69.1%Period 11 of 2025-26: 83.3%Period 12 of 2025-26: 69.1%Period 13 of 2025-26: 73.3%Period 1 of 2026-27: 76.3%Period 4 of 2026-27: 56.4%Period 5 of 2026-27: 48.1%Period 6 of 2026-27: 55.6%Period 7 of 2026-27: 71.4%
This pageGreat Britain
0%5%10%15%Period 11 of 2024-25: 10.0%Period 13 of 2024-25: 12.7%Period 3 of 2025-26: 14.0%Period 4 of 2025-26: 13.3%Period 5 of 2025-26: 11.7%Period 6 of 2025-26: 7.0%Period 7 of 2025-26: 6.7%Period 8 of 2025-26: 5.0%Period 9 of 2025-26: 5.0%Period 11 of 2025-26: 10.0%Period 12 of 2025-26: 8.3%Period 13 of 2025-26: 9.1%Period 1 of 2026-27: 4.8%Period 4 of 2026-27: 6.7%Period 5 of 2026-27: 7.1%Period 6 of 2026-27: 5.3%Period 7 of 2026-27: 14.0%2023-242024-252025-262026-27

See how GTR Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-275771.4%14.0%
Period 6 of 2026-275755.6%5.3%
Period 5 of 2026-275648.1%7.1%
Period 4 of 2026-276056.4%6.7%
Period 3 of 2026-2754––
Period 2 of 2026-2754––
Period 1 of 2026-276376.3%4.8%
Period 13 of 2025-266673.3%9.1%
Period 12 of 2025-266069.1%8.3%
Period 11 of 2025-266083.3%10.0%
Period 10 of 2025-2630––
Period 9 of 2025-266069.1%5.0%
Period 8 of 2025-266063.2%5.0%

Other operators at Southampton Airport Parkway

OperatorScheduled stopsWithin 3 minCancelled
South Western Railway45,85268.4%3.2%
CrossCountry10,94260.9%4.2%
Great Western Railway333––