Southampton Airport Parkway
SOASouth EastManaged by South Western Railway
How this station is performing
Southampton Airport Parkway had 57,864 scheduled stops to Period 7 of 2026-27, about 159 a day. 67.0% of recorded arrivals were within three minutes of the timetable and 3.5% of scheduled stops were cancelled.
Southampton Airport Parkway opened on 30 October 1929 and closed to passengers on 30 September 1931. It reopened on 1 April 1966, 60 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Eastleigh is the oldest (1839) and Chandlers Ford the newest (2003), with Southampton Airport Parkway in between.
The nearest stations to Southampton Airport Parkway are Swaythling (1.4 km south-west), Eastleigh (2.2 km north-east), St Denys (3.6 km south-west), Bitterne (3.7 km south) and Chandlers Ford (3.9 km north). 17 stations lie within 10 km in all. At 67.0%, Southampton Airport Parkway is less punctual than all of them; the best of the five, Bitterne, manages 77.5%.
Southampton Airport Parkway is a parkway station, 5.7 km from the centre of Southampton, a big city, home to about 271,173 people, which gives it its name.
4 operators call at Southampton Airport Parkway: South Western Railway (68.4%, 79% of stops), CrossCountry (60.9%, 19% of stops), GTR (66.7%, 1% of stops) and Great Western Railway (–, 1% of stops). The operator you travel with matters: South Western Railway reaches 68.4% within three minutes while CrossCountry manages 60.9%, a gap of 7.5 percentage points.
Compared with 3 stations of a similar size in South East, Southampton Airport Parkway is the least punctual, at 67.0%. All of them are ahead, including Otford (85.2%), Horley (76.4%) and Faversham (70.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 45,852 | 68.4% | 3.2% |
| CrossCountry | 10,942 | 60.9% | 4.2% |
| GTR | 737 | 66.7% | 7.5% |
| Great Western Railway | 333 | – | – |
Operators with their own page for this station are linked to it.
Late train at Southampton Airport Parkway? Delay Repay
These operators call at Southampton Airport Parkway and publish Delay Repay rules.
- South Western Railway: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- CrossCountry: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- GTR: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- Great Western Railway: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,421 | 58.8% | 3.6% |
| Period 6 of 2026-27 | 4,612 | 64.5% | 2.1% |
| Period 5 of 2026-27 | 4,594 | 55.0% | 3.6% |
| Period 4 of 2026-27 | 4,559 | 55.2% | 4.3% |
| Period 3 of 2026-27 | 4,499 | 67.7% | 4.7% |
| Period 2 of 2026-27 | 4,463 | 62.2% | 4.5% |
| Period 1 of 2026-27 | 4,329 | 76.6% | 1.7% |
| Period 13 of 2025-26 | 4,679 | 80.7% | 2.2% |
| Period 12 of 2025-26 | 3,973 | 76.8% | 4.3% |
| Period 11 of 2025-26 | 4,572 | 76.2% | 4.4% |
| Period 10 of 2025-26 | 4,072 | 74.1% | 4.2% |
| Period 9 of 2025-26 | 4,557 | 60.4% | 2.7% |
| Period 8 of 2025-26 | 4,534 | 63.8% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out