South Wigston
SWSEast MidlandsManaged by East Midlands Railway
How this station is performing
South Wigston had 10,378 scheduled stops to Period 7 of 2026-27, about 28 a day. 71.4% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
South Wigston opened on 12 May 1986, 40 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, South Wigston is the newest; the oldest, Leicester, opened in 1840.
The nearest stations to South Wigston are Narborough (4.8 km west), Leicester (5.6 km north), Syston (12.9 km north), Sileby (16.6 km north) and Hinckley (Leics) (16.9 km west). 2 stations lie within 10 km in all. Of the five, Syston is the most punctual at 82.5% and Leicester the least at 65.8%, with South Wigston on 71.4%.
South Wigston takes its name from a Village called South Wigston, home to about 7,471 people, and the station stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for South Wigston was Period 9 of 2024-25, at 63.6%, some time before the latest year. The strongest was Period 2 of 2024-25, at 83.3%, and the two are 19.7 percentage points apart. Cancellations peaked at 5.8% of scheduled stops in Period 4 of 2025-26, against 2.8% over the latest 13 periods.
Compared with 3 stations of a similar size in East Midlands, South Wigston is the least punctual, at 71.4%. All of them are ahead, including Sileby (82.2%), Syston (82.5%) and Barrow-upon-Soar (84.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 10,378 | 71.4% | 2.8% |
Operators with their own page for this station are linked to it.
Late train at South Wigston? Delay Repay
These operators call at South Wigston and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 786 | 70.3% | 3.6% |
| Period 6 of 2026-27 | 776 | 65.4% | 2.3% |
| Period 5 of 2026-27 | 803 | 68.3% | 2.9% |
| Period 4 of 2026-27 | 804 | 65.2% | 1.7% |
| Period 3 of 2026-27 | 712 | 68.3% | 4.1% |
| Period 2 of 2026-27 | 803 | 70.9% | 2.2% |
| Period 1 of 2026-27 | 924 | 77.9% | 2.1% |
| Period 13 of 2025-26 | 885 | 82.4% | 2.5% |
| Period 12 of 2025-26 | 806 | 77.9% | 0.9% |
| Period 11 of 2025-26 | 800 | 74.9% | 2.8% |
| Period 10 of 2025-26 | 719 | 70.5% | 5.3% |
| Period 9 of 2025-26 | 780 | 65.1% | 4.7% |
| Period 8 of 2025-26 | 780 | 68.3% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Sileby | 10,482 | 82.2% | 3.6% |
| Syston | 10,482 | 82.5% | 3.8% |
| Barrow-upon-Soar | 10,263 | 84.8% | 3.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out