Sileby
SILEast MidlandsManaged by East Midlands Railway
How this station is performing
Sileby had 10,482 scheduled stops to Period 7 of 2026-27, about 29 a day. 82.2% of recorded arrivals were within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
Sileby opened on 5 May 1840 and closed to passengers on 4 March 1968. It reopened on 30 May 1994, 32 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Sileby is the oldest; the next oldest, Barrow-upon-Soar, dates from 1840.
The nearest stations to Sileby are Barrow-upon-Soar (3.2 km north-west), Syston (4.5 km south-east), Loughborough (8.0 km north-west), Leicester (11.1 km south) and Melton Mowbray (15.4 km east). 3 stations lie within 10 km in all. Of the five, Barrow-upon-Soar is the most punctual at 84.8% and Loughborough the least at 65.2%, with Sileby on 82.2%.
Sileby takes its name from a Village called Sileby, home to about 8,956 people, and the station stands 0.2 km from its centre.
Sileby improved sharply over the past year. In the latest 13 periods 82.2% of stops came within three minutes of the timetable, up 5.9 percentage points from 76.3% in the 13 before. Cancellations rose to 3.6% of scheduled stops from 3.1%, which is 0.5 percentage points more.
1 of 3 stations of a similar size in East Midlands are more punctual than Sileby on 82.2%. The comparison group includes Syston (82.5%), South Wigston (71.4%) and Skegness (74.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 10,482 | 82.2% | 3.6% |
Operators with their own page for this station are linked to it.
Late train at Sileby? Delay Repay
These operators call at Sileby and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 812 | 83.7% | 2.7% |
| Period 6 of 2026-27 | 777 | 83.5% | 6.6% |
| Period 5 of 2026-27 | 797 | 85.8% | 5.4% |
| Period 4 of 2026-27 | 729 | 79.7% | 4.9% |
| Period 3 of 2026-27 | 726 | 80.7% | 3.4% |
| Period 2 of 2026-27 | 816 | 83.5% | 4.8% |
| Period 1 of 2026-27 | 949 | 84.8% | 5.6% |
| Period 13 of 2025-26 | 880 | 83.3% | 1.3% |
| Period 12 of 2025-26 | 816 | 87.0% | 1.2% |
| Period 11 of 2025-26 | 803 | 88.8% | 1.9% |
| Period 10 of 2025-26 | 742 | 81.7% | 3.2% |
| Period 9 of 2025-26 | 805 | 70.1% | 4.1% |
| Period 8 of 2025-26 | 830 | 74.8% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Syston | 10,482 | 82.5% | 3.8% |
| South Wigston | 10,378 | 71.4% | 2.8% |
| Skegness | 10,630 | 74.7% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out