Bagshot
BAGSouth EastManaged by South Western Railway
How this station is performing
Bagshot had 24,782 scheduled stops to Period 7 of 2026-27, about 68 a day. 97.0% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Bagshot opened on 18 March 1878, 148 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Ascot (Berks) is the oldest (1856) and Martins Heron the newest (1988), with Bagshot in between.
The nearest stations to Bagshot are Ascot (Berks) (4.7 km north), Sunningdale (4.9 km north-east), Camberley (4.9 km south-west), Martins Heron (5.5 km north-west) and Longcross (6.9 km east). 14 stations lie within 10 km in all. At 97.0%, Bagshot is more punctual than every one of them; the best of the five, Camberley, manages 95.9%.
Bagshot is one of 2 stations named after a Village called Bagshot, home to about 7,500 people; this one stands 0.8 km from its centre.
Bagshot is among the most punctual stations in Britain. Its 97.0% puts it 35th out of 2,374 ranked stations, with 34 ahead of it and 2,339 behind, and 13.1 percentage points above the national median of 83.9%.
Compared with 3 stations of a similar size in South East, Bagshot is the most punctual, at 97.0%. The comparison group includes Camberley (95.9%), Frimley (96.7%) and Snodland (94.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 24,782 | 97.0% | 2.5% |
Operators with their own page for this station are linked to it.
Late train at Bagshot? Delay Repay
These operators call at Bagshot and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,885 | 97.4% | 2.7% |
| Period 6 of 2026-27 | 1,795 | 97.1% | 1.6% |
| Period 5 of 2026-27 | 1,936 | 97.4% | 2.2% |
| Period 4 of 2026-27 | 1,836 | 97.0% | 2.8% |
| Period 3 of 2026-27 | 1,852 | 96.6% | 4.8% |
| Period 2 of 2026-27 | 1,925 | 96.3% | 4.6% |
| Period 1 of 2026-27 | 2,205 | 97.9% | 2.4% |
| Period 13 of 2025-26 | 2,121 | 98.1% | 0.9% |
| Period 12 of 2025-26 | 1,860 | 97.6% | 0.8% |
| Period 11 of 2025-26 | 1,904 | 97.7% | 1.1% |
| Period 10 of 2025-26 | 1,689 | 97.8% | 2.5% |
| Period 9 of 2025-26 | 1,884 | 95.6% | 1.6% |
| Period 8 of 2025-26 | 1,890 | 94.7% | 4.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out