Conisbrough
CNSYorkshire and The HumberManaged by Northern Trains
How this station is performing
Conisbrough had 15,107 scheduled stops to Period 7 of 2026-27, about 42 a day. 82.3% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Conisbrough opened on 10 November 1849, 177 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Swinton (South Yorks) is the oldest (1840) and Goldthorpe the newest (1988), with Conisbrough in between.
The nearest stations to Conisbrough are Mexborough (3.6 km west), Swinton (South Yorks) (4.7 km west), Bolton-upon-Dearne (6.0 km north-west), Goldthorpe (7.1 km north-west) and Doncaster (7.2 km north-east). 8 stations lie within 10 km in all. At 82.3%, Conisbrough is more punctual than every one of them; the best of the five, Mexborough, manages 81.1%.
Conisbrough takes its name from a town called Conisbrough, home to about 14,333 people, and the station stands 1.3 km from its centre.
Across the whole run of data, the weakest four-week period for Conisbrough was Period 9 of 2023-24, at 73.7%, some time before the latest year. The strongest was Period 13 of 2024-25, at 86.6%, and the two are 12.9 percentage points apart. Cancellations peaked at 17.2% of scheduled stops in Period 8 of 2023-24, against 2.7% over the latest 13 periods.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Conisbrough is the most punctual, at 82.3%. The comparison group includes Mexborough (81.1%), Moorthorpe (75.0%) and Slaithwaite (64.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 15,107 | 82.3% | 2.7% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,159 | 85.7% | 1.6% |
| Period 6 of 2026-27 | 1,160 | 84.5% | 3.0% |
| Period 5 of 2026-27 | 1,160 | 81.6% | 3.2% |
| Period 4 of 2026-27 | 1,160 | 82.3% | 5.2% |
| Period 3 of 2026-27 | 1,160 | 81.2% | 3.0% |
| Period 2 of 2026-27 | 1,159 | 80.3% | 0.9% |
| Period 1 of 2026-27 | 1,331 | 85.2% | 2.2% |
| Period 13 of 2025-26 | 1,278 | 86.2% | 0.9% |
| Period 12 of 2025-26 | 1,129 | 81.8% | 1.8% |
| Period 11 of 2025-26 | 1,160 | 79.6% | 2.2% |
| Period 10 of 2025-26 | 1,035 | 79.3% | 5.0% |
| Period 9 of 2025-26 | 1,108 | 77.3% | 4.7% |
| Period 8 of 2025-26 | 1,108 | 82.8% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Mexborough | 15,108 | 81.1% | 2.6% |
| Moorthorpe | 15,407 | 75.0% | 2.2% |
| Slaithwaite | 15,435 | 64.5% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out