Transport for Wales had 46,967 scheduled stops at Shrewsbury in the 13 periods to Period 7 of 2026-27, 68% of the station's total. 73.6% of recorded arrivals came within three minutes and 2.3% of stops were cancelled.
Transport for Wales trains at Shrewsbury also serve Yorton (10.8 km north, 86.0% on time, 1.9% cancelled), Wellington (Shropshire) (15.7 km east, 71.5% on time, 4.1% cancelled), Wem (16.2 km north, 75.2% on time, 1.9% cancelled), Church Stretton (19.8 km south, 66.4% on time, 3.2% cancelled), Oakengates (20.3 km east, – on time, – cancelled) and Telford Central (21.1 km east, 69.3% on time, 4.1% cancelled), which are the stations on its network closest to Shrewsbury.
Within 30 km of here, Transport for Wales runs best at Yorton, 10.8 km north (86.0%), and worst at Church Stretton, 19.8 km south (66.4%).
The busiest Transport for Wales station within 30 km of Shrewsbury is Church Stretton, 19.8 km south, with about 47 scheduled stops a day.
Of the 2 operators with enough records at Shrewsbury, Transport for Wales is the least punctual, at 73.6%.
Over three full railway years Transport for Wales at Shrewsbury has improved each time, from 65.9% within three minutes in 2023-24 to 71.2% in 2024-25 and 74.4% in 2025-26.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,550 | 70.9% | 1.4% |
| Period 6 of 2026-27 | 3,517 | 68.8% | 2.6% |
| Period 5 of 2026-27 | 3,468 | 66.6% | 3.5% |
| Period 4 of 2026-27 | 3,352 | 70.0% | 3.4% |
| Period 3 of 2026-27 | 3,498 | 76.5% | 2.2% |
| Period 2 of 2026-27 | 3,574 | 75.4% | 3.5% |
| Period 1 of 2026-27 | 4,220 | 79.8% | 1.2% |
| Period 13 of 2025-26 | 4,044 | 81.4% | 1.1% |
| Period 12 of 2025-26 | 3,647 | 81.1% | 1.0% |
| Period 11 of 2025-26 | 3,533 | 78.3% | 3.8% |
| Period 10 of 2025-26 | 3,361 | 74.8% | 2.6% |
| Period 9 of 2025-26 | 3,584 | 61.9% | 3.0% |
| Period 8 of 2025-26 | 3,619 | 68.7% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Shrewsbury
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 22,132 | 83.5% | 3.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out