Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Southeastern at Shoreham (Kent)

All trains at Shoreham (Kent)Southeastern across BritainSouth East

On time, last 13 periods97.1%Whole station: 91.3%
Cancelled0.0%Whole station: 3.1%
Scheduled stops101Of 26,033 at the station

How this operator is doing here

Southeastern had 101 scheduled stops at Shoreham (Kent) in the 13 periods to Period 7 of 2026-27, 0% of the station's total. 97.1% of recorded arrivals came within three minutes and 0.0% of stops were cancelled.

Southeastern trains at Shoreham (Kent) also serve Otford (2.2 km south, 80.3% on time, 1.2% cancelled), Eynsford (3.5 km north, 94.3% on time, 0.0% cancelled), Dunton Green (4.1 km south, 81.6% on time, 1.4% cancelled), Knockholt (4.3 km west, 81.0% on time, 1.4% cancelled), Kemsing (5.6 km south-east, 81.0% on time, 1.3% cancelled) and Sevenoaks (6.2 km south, 72.3% on time, 1.6% cancelled), which are the stations on its network closest to Shoreham (Kent).

Within 30 km of here, Southeastern runs best at Sundridge Park, 14.8 km north-west (99.4%), and worst at Hildenborough, 13.4 km south (70.3%).

The busiest Southeastern station within 30 km of Shoreham (Kent) is London Bridge, 27.0 km north-west, with about 912 scheduled stops a day.

Of the 2 operators with enough records at Shoreham (Kent), Southeastern is the most punctual, at 97.1%.

Southeastern cancels fewer trains at Shoreham (Kent) than elsewhere: 0.0% of scheduled stops, against 1.7% across its network and 3.1% for every operator at the station.

Alongside Southeastern, the other operators at Shoreham (Kent) are GTR (91.3%, 100% of stops), so passengers here can compare several services.

Period by period

80%90%100%2023-242024-252025-262026-27Period 2 of 2023-24: 87.1%Period 9 of 2024-25: 79.5%Period 1 of 2026-27: 97.1%
This pageGreat Britain
0%2%4%Period 2 of 2023-24: 0.0%Period 9 of 2024-25: 0.0%Period 1 of 2026-27: 0.0%2023-242024-252025-262026-27

See how Southeastern Delay Repay works

The last 13 periods

Other operators at Shoreham (Kent)

OperatorScheduled stopsWithin 3 minCancelled
GTR25,93291.3%3.1%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out