GTR at Shoreham (Kent)
How this operator is doing here
GTR had 25,932 scheduled stops at Shoreham (Kent) in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 91.3% of recorded arrivals came within three minutes and 3.1% of stops were cancelled.
GTR trains at Shoreham (Kent) also serve Otford (2.2 km south, 91.3% on time, 3.1% cancelled), Eynsford (3.5 km north, 89.8% on time, 3.1% cancelled), Bat and Ball (4.7 km south, 91.9% on time, 3.1% cancelled), Sevenoaks (6.2 km south, 90.6% on time, 2.6% cancelled), Swanley (6.9 km north, 88.0% on time, 3.0% cancelled) and Orpington (8.3 km north-west, 81.0% on time, 5.9% cancelled), which are the stations on its network closest to Shoreham (Kent).
Within 30 km of here, GTR runs best at Beckenham Junction, 17.3 km north-west (98.1%), and worst at Kenley, 20.2 km west (66.9%).
The busiest GTR station within 30 km of Shoreham (Kent) is East Croydon, 20.2 km west, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Shoreham (Kent), GTR is the least punctual, at 91.3%.
For GTR, Shoreham (Kent) is the 40th best of 307 ranked stations. Its 91.3% here is 8.4 percentage points above the 82.9% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,987 | 86.5% | 1.7% |
| Period 6 of 2026-27 | 1,889 | 85.2% | 4.2% |
| Period 5 of 2026-27 | 2,060 | 90.7% | 3.5% |
| Period 4 of 2026-27 | 2,056 | 91.2% | 3.6% |
| Period 3 of 2026-27 | 1,858 | 91.3% | 3.7% |
| Period 2 of 2026-27 | 1,915 | 92.8% | 3.5% |
| Period 1 of 2026-27 | 2,142 | 95.0% | 1.0% |
| Period 13 of 2025-26 | 2,173 | 93.2% | 3.0% |
| Period 12 of 2025-26 | 2,059 | 94.0% | 1.9% |
| Period 11 of 2025-26 | 2,020 | 94.0% | 2.1% |
| Period 10 of 2025-26 | 1,789 | 92.0% | 3.7% |
| Period 9 of 2025-26 | 1,930 | 88.6% | 4.6% |
| Period 8 of 2025-26 | 2,054 | 91.2% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Shoreham (Kent)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 101 | 97.1% | 0.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out