ScotRail at Shieldmuir
How this operator is doing here
ScotRail had 24,389 scheduled stops at Shieldmuir in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 85.7% of recorded arrivals came within three minutes and 1.6% of stops were cancelled.
ScotRail trains at Shieldmuir also serve Wishaw (2.1 km east, 86.8% on time, 1.7% cancelled), Airbles (2.4 km west, 94.0% on time, 2.0% cancelled), Motherwell (2.8 km north-west, 83.7% on time, 1.6% cancelled), Chatelherault (3.2 km south-west, 81.3% on time, 2.8% cancelled), Carfin (3.4 km north, 87.0% on time, 1.5% cancelled) and Merryton (3.4 km south, 81.1% on time, 3.3% cancelled), which are the stations on its network closest to Shieldmuir.
Within 30 km of here, ScotRail runs best at Neilston, 29.4 km west (97.6%), and worst at Bargeddie, 10.9 km north-west (69.7%).
The busiest ScotRail station within 30 km of Shieldmuir is Glasgow Central, 20.8 km north-west, with about 995 scheduled stops a day.
Of the 1 operators with enough records at Shieldmuir, ScotRail is the most punctual, at 85.7%.
For ScotRail, Shieldmuir is the 203rd best of 312 ranked stations. Its 85.7% here is 2.2 percentage points below the 87.9% across the whole network.
Over three full railway years ScotRail at Shieldmuir has got worse each time, from 89.8% within three minutes in 2023-24 to 87.9% in 2024-25 and 86.1% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,914 | 84.9% | 1.7% |
| Period 6 of 2026-27 | 1,944 | 86.8% | 1.3% |
| Period 5 of 2026-27 | 1,944 | 85.9% | 1.4% |
| Period 4 of 2026-27 | 1,843 | 87.5% | 1.8% |
| Period 3 of 2026-27 | 1,944 | 87.3% | 0.8% |
| Period 2 of 2026-27 | 1,873 | 86.9% | 1.3% |
| Period 1 of 2026-27 | 2,067 | 86.9% | 1.2% |
| Period 13 of 2025-26 | 1,513 | 88.0% | 1.8% |
| Period 12 of 2025-26 | 1,944 | 87.8% | 2.7% |
| Period 11 of 2025-26 | 1,944 | 87.4% | 0.8% |
| Period 10 of 2025-26 | 1,649 | 81.8% | 2.7% |
| Period 9 of 2025-26 | 1,907 | 80.4% | 2.6% |
| Period 8 of 2025-26 | 1,903 | 82.3% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Shieldmuir
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out