Shepperton
SHPSouth EastManaged by South Western Railway
How this station is performing
Shepperton had 26,947 scheduled stops to Period 7 of 2026-27, about 74 a day. 88.6% of recorded arrivals were within three minutes of the timetable and 4.0% of scheduled stops were cancelled.
Shepperton opened on 1 November 1864, 162 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Walton-on-Thames is the oldest (1838) and Upper Halliford the newest (1944), with Shepperton in between.
The nearest stations to Shepperton are Upper Halliford (2.1 km north-east), Sunbury (3.2 km north-east), Walton-on-Thames (3.5 km south-east), Addlestone (3.7 km south-west) and Kempton Park Racecourse (3.7 km north-east). 34 stations lie within 10 km in all. At 88.6%, Shepperton is more punctual than every one of them; the best of the five, Upper Halliford, manages 87.1%.
Shepperton takes its name from a town called Shepperton, home to about 9,753 people, and the station stands 0.2 km from its centre.
Shepperton has edged up: 88.6% of stops came within three minutes of the timetable in the latest 13 periods, 4.6 percentage points better than the 84.0% of the 13 before. Cancellations held steady at 4.0% of scheduled stops, against 4.2% before.
1 of 3 stations of a similar size in South East are more punctual than Shepperton on 88.6%. The comparison group includes Dormans (88.4%), Lingfield (91.5%) and Balcombe (76.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 26,947 | 88.6% | 4.0% |
Operators with their own page for this station are linked to it.
Late train at Shepperton? Delay Repay
These operators call at Shepperton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,046 | 93.2% | 2.4% |
| Period 6 of 2026-27 | 2,066 | 92.0% | 2.3% |
| Period 5 of 2026-27 | 2,072 | 89.6% | 2.2% |
| Period 4 of 2026-27 | 1,969 | 90.7% | 2.0% |
| Period 3 of 2026-27 | 2,048 | 89.2% | 10.5% |
| Period 2 of 2026-27 | 2,053 | 83.8% | 5.2% |
| Period 1 of 2026-27 | 2,411 | 91.9% | 3.2% |
| Period 13 of 2025-26 | 2,315 | 93.0% | 1.9% |
| Period 12 of 2025-26 | 1,959 | 82.3% | 5.1% |
| Period 11 of 2025-26 | 2,076 | 89.6% | 2.6% |
| Period 10 of 2025-26 | 1,807 | 87.4% | 4.9% |
| Period 9 of 2025-26 | 2,079 | 81.8% | 3.0% |
| Period 8 of 2025-26 | 2,046 | 85.7% | 7.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out