How this station is performing
Dormans had 27,008 scheduled stops to Period 7 of 2026-27, about 74 a day. 88.4% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Dormans opened on 10 March 1884, 142 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Edenbridge (Kent) is the oldest (1842) and Hever the newest (1888), with Dormans in between.
The nearest stations to Dormans are Lingfield (2.3 km north), East Grinstead (3.4 km south), Edenbridge Town (7.0 km north-east), Edenbridge (Kent) (7.4 km north-east) and Hever (7.5 km east). 8 stations lie within 10 km in all. Of the five, Lingfield is the most punctual at 91.5% and Edenbridge Town the least at 69.5%, with Dormans on 88.4%.
Dormans has slipped a little, from 92.5% within three minutes in the previous 13 periods to 88.4% in the latest 13, a fall of 4.1 percentage points. Cancellations rose to 3.4% of scheduled stops from 2.9%, which is 0.5 percentage points more.
2 of 3 stations of a similar size in South East are more punctual than Dormans on 88.4%. The comparison group includes Lingfield (91.5%), Shepperton (88.6%) and Balcombe (76.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 27,008 | 88.4% | 3.4% |
Operators with their own page for this station are linked to it.
Late train at Dormans? Delay Repay
These operators call at Dormans and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,141 | 81.1% | 3.5% |
| Period 6 of 2026-27 | 2,083 | 77.5% | 2.8% |
| Period 5 of 2026-27 | 2,142 | 82.5% | 5.0% |
| Period 4 of 2026-27 | 2,156 | 90.4% | 2.6% |
| Period 3 of 2026-27 | 2,082 | 89.8% | 2.9% |
| Period 2 of 2026-27 | 1,896 | 93.3% | 1.7% |
| Period 1 of 2026-27 | 2,429 | 95.2% | 1.2% |
| Period 13 of 2025-26 | 2,312 | 93.5% | 3.4% |
| Period 12 of 2025-26 | 2,058 | 90.7% | 3.0% |
| Period 11 of 2025-26 | 1,899 | 90.1% | 4.6% |
| Period 10 of 2025-26 | 1,811 | 92.3% | 3.3% |
| Period 9 of 2025-26 | 1,959 | 87.6% | 5.0% |
| Period 8 of 2025-26 | 2,040 | 84.8% | 5.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lingfield | 27,008 | 91.5% | 3.4% |
| Shepperton | 26,947 | 88.6% | 4.0% |
| Balcombe | 27,142 | 76.6% | 4.4% |