Seven Sisters
SVSLondonManaged by London Overground
How this station is performing
Seven Sisters had 60,194 scheduled stops to Period 7 of 2026-27, about 165 a day. 94.9% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Seven Sisters opened on 22 July 1872, 154 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Tottenham Hale is the oldest (1840) and Harringay Green Lanes the newest (1880), with Seven Sisters in between.
The nearest stations to Seven Sisters are South Tottenham (0.3 km south-east), Stamford Hill (0.8 km south), Tottenham Hale (1.2 km north-east), Bruce Grove (1.3 km north) and Harringay Green Lanes (1.7 km west). 106 stations lie within 10 km in all. At 94.9%, Seven Sisters is more punctual than every one of them; the best of the five, Bruce Grove, manages 94.9%.
Seven Sisters is one of 2 stations named after an area of London called Seven Sisters, home to about 15,968 people; this one stands 0.1 km from its centre.
2 operators call at Seven Sisters: London Overground (95.3%, 95% of stops) and Greater Anglia (86.0%, 5% of stops). The operator you travel with matters: London Overground reaches 95.3% within three minutes while Greater Anglia manages 86.0%, a gap of 9.3 percentage points.
Compared with 3 stations of a similar size in London, Seven Sisters is the most punctual, at 94.9%. The comparison group includes Crayford (88.4%), Sidcup (86.8%) and St Mary Cray (85.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 57,470 | 95.3% | 1.8% |
| Greater Anglia | 2,724 | 86.0% | 1.4% |
Operators with their own page for this station are linked to it.
Late train at Seven Sisters? Delay Repay
These operators call at Seven Sisters and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,244 | 95.2% | 1.8% |
| Period 6 of 2026-27 | 4,146 | 93.9% | 2.4% |
| Period 5 of 2026-27 | 4,736 | 95.0% | 1.8% |
| Period 4 of 2026-27 | 3,912 | 94.1% | 2.8% |
| Period 3 of 2026-27 | 4,854 | 94.0% | 1.3% |
| Period 2 of 2026-27 | 5,542 | 95.9% | 0.4% |
| Period 1 of 2026-27 | 5,553 | 95.8% | 2.2% |
| Period 13 of 2025-26 | 4,542 | 96.0% | 1.0% |
| Period 12 of 2025-26 | 4,649 | 95.4% | 1.7% |
| Period 11 of 2025-26 | 4,777 | 97.4% | 0.5% |
| Period 10 of 2025-26 | 3,815 | 95.6% | 2.5% |
| Period 9 of 2025-26 | 4,624 | 93.2% | 1.8% |
| Period 8 of 2025-26 | 4,800 | 92.0% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Crayford | 59,940 | 88.4% | 1.4% |
| Sidcup | 59,566 | 86.8% | 1.4% |
| St Mary Cray | 59,505 | 85.7% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out