Greater Anglia at Seven Sisters
All trains at Seven SistersGreater Anglia across BritainLondon
How this operator is doing here
Greater Anglia had 2,724 scheduled stops at Seven Sisters in the 13 periods to Period 7 of 2026-27, 5% of the station's total. 86.0% of recorded arrivals came within three minutes and 1.4% of stops were cancelled.
Greater Anglia trains at Seven Sisters also serve Tottenham Hale (1.2 km north-east, 90.3% on time, 3.2% cancelled), White Hart Lane (2.5 km north, 77.4% on time, 3.1% cancelled), Northumberland Park (2.6 km north-east, 94.4% on time, 3.9% cancelled), Lea Bridge (3.1 km south-east, 97.5% on time, 3.9% cancelled), Meridian Water (3.5 km north-east, 96.5% on time, 4.2% cancelled) and Hackney Downs (3.9 km south, 89.2% on time, 2.4% cancelled), which are the stations on its network closest to Seven Sisters.
Within 30 km of here, Greater Anglia runs best at Lea Bridge, 3.1 km south-east (97.5%), and worst at Cheshunt, 13.8 km north (85.4%).
The busiest Greater Anglia station within 30 km of Seven Sisters is London Liverpool Street, 7.2 km south, with about 603 scheduled stops a day.
Of the 2 operators with enough records at Seven Sisters, Greater Anglia is the least punctual, at 86.0%.
Greater Anglia at Seven Sisters has not moved in one direction over three full railway years: 90.8% within three minutes in 2023-24, 93.5% in 2024-25 and 84.8% in 2025-26.
Period by period
See how Greater Anglia Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 136 | 70.1% | 1.5% |
| Period 6 of 2026-27 | 90 | 60.0% | 5.6% |
| Period 5 of 2026-27 | 132 | 85.6% | 0.0% |
| Period 4 of 2026-27 | 104 | 79.0% | 3.8% |
| Period 3 of 2026-27 | 269 | 88.8% | 0.4% |
| Period 2 of 2026-27 | 983 | 91.2% | 0.9% |
| Period 1 of 2026-27 | 329 | 93.5% | 1.5% |
| Period 13 of 2025-26 | 127 | 89.8% | 0.0% |
| Period 12 of 2025-26 | 72 | 72.5% | 4.2% |
| Period 11 of 2025-26 | 142 | 85.2% | 0.0% |
| Period 10 of 2025-26 | 102 | 82.4% | 0.0% |
| Period 9 of 2025-26 | 76 | 70.8% | 5.3% |
| Period 8 of 2025-26 | 162 | 79.6% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Seven Sisters
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 57,470 | 95.3% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out