Selhurst
SRSLondonManaged by Govia Thameslink Railway (Southern)
How this station is performing
Selhurst had 75,762 scheduled stops to Period 7 of 2026-27, about 208 a day. 90.2% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
Selhurst opened on 1 May 1865, 161 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Norwood Junction is the oldest (1839) and Birkbeck the newest (1930), with Selhurst in between.
The nearest stations to Selhurst are Norwood Junction (1.1 km north-east), Thornton Heath (1.2 km north-west), West Croydon (1.8 km south-west), East Croydon (1.9 km south) and Birkbeck (2.6 km north-east). 97 stations lie within 10 km in all. Of the five, Birkbeck is the most punctual at 98.1% and East Croydon the least at 77.5%, with Selhurst on 90.2%.
Selhurst takes its name from an area of London called Selhurst, home to about 18,087 people, and the station stands 1.3 km from its centre.
GTR is the only operator serving Selhurst. Here it manages 90.2% within three minutes, 7.3 percentage points better than its 82.9% across its whole network.
1 of 3 stations of a similar size in London are more punctual than Selhurst on 90.2%. The comparison group includes New Malden (87.1%), Grove Park (93.0%) and Bickley (85.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 75,762 | 90.2% | 3.3% |
Operators with their own page for this station are linked to it.
Late train at Selhurst? Delay Repay
These operators call at Selhurst and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,676 | 90.1% | 4.7% |
| Period 6 of 2026-27 | 5,844 | 89.6% | 2.1% |
| Period 5 of 2026-27 | 5,683 | 86.7% | 5.3% |
| Period 4 of 2026-27 | 5,808 | 91.3% | 4.0% |
| Period 3 of 2026-27 | 5,760 | 91.6% | 3.2% |
| Period 2 of 2026-27 | 5,771 | 90.7% | 4.4% |
| Period 1 of 2026-27 | 6,299 | 92.5% | 1.4% |
| Period 13 of 2025-26 | 6,407 | 90.7% | 3.7% |
| Period 12 of 2025-26 | 5,890 | 90.0% | 3.5% |
| Period 11 of 2025-26 | 5,817 | 89.1% | 1.7% |
| Period 10 of 2025-26 | 5,120 | 89.4% | 3.0% |
| Period 9 of 2025-26 | 5,857 | 89.6% | 1.9% |
| Period 8 of 2025-26 | 5,830 | 90.2% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| New Malden | 75,019 | 87.1% | 5.8% |
| Grove Park | 73,969 | 93.0% | 0.9% |
| Bickley | 78,012 | 85.8% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out