Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

New Malden

NEMLondonManaged by South Western Railway

On time, last 13 periods87.1%Great Britain: 83.6%
Cancelled5.8%Great Britain: 3.2%
Stops a day206Scheduled, on average
Punctuality rank858th of 2,374Among ranked stations

How this station is performing

New Malden had 75,019 scheduled stops to Period 7 of 2026-27, about 206 a day. 87.1% of recorded arrivals were within three minutes of the timetable and 5.8% of scheduled stops were cancelled.

The nearest stations to New Malden are Motspur Park (1.5 km south-east), Berrylands (1.8 km west), Raynes Park (1.8 km east), Norbiton (2.2 km north-west) and Malden Manor (2.2 km south). 72 stations lie within 10 km in all. Of the five, Malden Manor is the most punctual at 87.3% and Berrylands the least at 84.8%, with New Malden on 87.1%.

New Malden takes its name from an area of London called New Malden, and the station stands 0.5 km from its centre.

Across the whole run of data, the weakest four-week period for New Malden was Period 9 of 2024-25, at 64.7%, some time before the latest year. The strongest was Period 5 of 2023-24, at 95.9%, and the two are 31.2 percentage points apart. Cancellations peaked at 12.0% of scheduled stops in Period 1 of 2025-26, against 5.8% over the latest 13 periods.

Compared with 3 stations of a similar size in London, New Malden is the least punctual, at 87.1%. All of them are ahead, including Selhurst (90.2%), Grove Park (93.0%) and Streatham (Greater London) (87.6%).

Period by period

60%70%80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 94.5%Period 2 of 2023-24: 95.7%Period 3 of 2023-24: 91.9%Period 4 of 2023-24: 92.8%Period 5 of 2023-24: 95.9%Period 6 of 2023-24: 91.0%Period 7 of 2023-24: 88.0%Period 8 of 2023-24: 84.3%Period 9 of 2023-24: 75.7%Period 10 of 2023-24: 86.7%Period 11 of 2023-24: 90.8%Period 12 of 2023-24: 90.3%Period 13 of 2023-24: 92.3%Period 1 of 2024-25: 93.5%Period 2 of 2024-25: 93.2%Period 3 of 2024-25: 92.7%Period 4 of 2024-25: 90.1%Period 5 of 2024-25: 92.3%Period 6 of 2024-25: 91.5%Period 7 of 2024-25: 88.1%Period 8 of 2024-25: 82.7%Period 9 of 2024-25: 64.7%Period 10 of 2024-25: 84.5%Period 11 of 2024-25: 83.9%Period 12 of 2024-25: 89.4%Period 13 of 2024-25: 92.3%Period 1 of 2025-26: 90.8%Period 2 of 2025-26: 89.3%Period 3 of 2025-26: 85.7%Period 4 of 2025-26: 83.1%Period 5 of 2025-26: 88.5%Period 6 of 2025-26: 86.8%Period 7 of 2025-26: 85.4%Period 8 of 2025-26: 79.8%Period 9 of 2025-26: 75.2%Period 10 of 2025-26: 84.1%Period 11 of 2025-26: 87.3%Period 12 of 2025-26: 84.7%Period 13 of 2025-26: 92.2%Period 1 of 2026-27: 90.5%Period 2 of 2026-27: 84.0%Period 3 of 2026-27: 88.3%Period 4 of 2026-27: 90.9%Period 5 of 2026-27: 89.5%Period 6 of 2026-27: 92.1%Period 7 of 2026-27: 91.6%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 3.6%Period 2 of 2023-24: 1.4%Period 3 of 2023-24: 2.4%Period 4 of 2023-24: 2.1%Period 5 of 2023-24: 1.4%Period 6 of 2023-24: 2.5%Period 7 of 2023-24: 3.1%Period 8 of 2023-24: 4.8%Period 9 of 2023-24: 6.0%Period 10 of 2023-24: 4.1%Period 11 of 2023-24: 3.6%Period 12 of 2023-24: 5.6%Period 13 of 2023-24: 2.8%Period 1 of 2024-25: 3.3%Period 2 of 2024-25: 3.6%Period 3 of 2024-25: 2.1%Period 4 of 2024-25: 3.5%Period 5 of 2024-25: 4.4%Period 6 of 2024-25: 4.2%Period 7 of 2024-25: 4.6%Period 8 of 2024-25: 5.7%Period 9 of 2024-25: 8.9%Period 10 of 2024-25: 3.9%Period 11 of 2024-25: 6.1%Period 12 of 2024-25: 3.9%Period 13 of 2024-25: 4.4%Period 1 of 2025-26: 12.0%Period 2 of 2025-26: 3.1%Period 3 of 2025-26: 5.3%Period 4 of 2025-26: 7.8%Period 5 of 2025-26: 6.8%Period 6 of 2025-26: 4.1%Period 7 of 2025-26: 6.1%Period 8 of 2025-26: 8.5%Period 9 of 2025-26: 5.7%Period 10 of 2025-26: 6.2%Period 11 of 2025-26: 3.9%Period 12 of 2025-26: 8.5%Period 13 of 2025-26: 2.8%Period 1 of 2026-27: 4.3%Period 2 of 2026-27: 9.2%Period 3 of 2026-27: 8.8%Period 4 of 2026-27: 3.7%Period 5 of 2026-27: 4.6%Period 6 of 2026-27: 5.2%Period 7 of 2026-27: 4.6%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
South Western Railway75,01987.1%5.8%

Operators with their own page for this station are linked to it.

Late train at New Malden? Delay Repay

These operators call at New Malden and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-275,72891.6%4.6%
Period 6 of 2026-275,68392.1%5.2%
Period 5 of 2026-275,91389.5%4.6%
Period 4 of 2026-275,92490.9%3.7%
Period 3 of 2026-275,52488.3%8.8%
Period 2 of 2026-275,86984.0%9.2%
Period 1 of 2026-276,71390.5%4.3%
Period 13 of 2025-265,77592.2%2.8%
Period 12 of 2025-265,63484.7%8.5%
Period 11 of 2025-265,81987.3%3.9%
Period 10 of 2025-264,98084.1%6.2%
Period 9 of 2025-265,71075.2%5.7%
Period 8 of 2025-265,74779.8%8.5%

Time of year

70%80%90%P1: 92.3%1P2: 90.6%2P3: 89.7%3P4: 89.1%4P5: 91.4%5P6: 90.3%6P7: 88.3%7P8: 82.3%8P9: 71.9%9P10: 85.1%10P11: 87.4%11P12: 88.1%12P13: 92.3%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in London

StationScheduled stopsWithin 3 minCancelled
Selhurst75,76290.2%3.3%
Grove Park73,96993.0%0.9%
Streatham (Greater London)73,38787.6%5.7%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out