How this operator is doing here
LNER had 662 scheduled stops at Selby in the 13 periods to Period 7 of 2026-27, 1% of the station's total. 71.9% of recorded arrivals came within three minutes and 7.3% of stops were cancelled.
LNER trains at Selby also serve York (19.6 km north, 61.6% on time, 2.7% cancelled), Doncaster (29.5 km south, 66.0% on time, 2.8% cancelled), Wakefield Westgate (31.2 km west, 64.7% on time, 3.7% cancelled), Leeds (31.9 km west, 70.1% on time, 3.8% cancelled), Brough (32.5 km east, 69.0% on time, 5.6% cancelled) and Horsforth (37.9 km west, 73.1% on time, 6.2% cancelled), which are the stations on its network closest to Selby.
The busiest LNER station within 30 km of Selby is Doncaster, 29.5 km south, with about 116 scheduled stops a day.
LNER ranks 3rd of the 4 operators with enough records at Selby, on 71.9%.
LNER cancels more at Selby than elsewhere: 7.3% of scheduled stops, against 2.9% across its network and 2.0% for every operator at the station.
Over three full railway years LNER at Selby has got worse each time, from 86.7% within three minutes in 2023-24 to 85.9% in 2024-25 and 80.3% in 2025-26.
Alongside LNER, the other operators at Selby are Northern (75.0%, 59% of stops), TransPennine Express (73.1%, 29% of stops) and Hull Trains (70.6%, 11% of stops), so passengers here can compare several services.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 43 | – | – |
| Period 6 of 2026-27 | 48 | – | – |
| Period 5 of 2026-27 | 51 | – | – |
| Period 4 of 2026-27 | 52 | – | – |
| Period 3 of 2026-27 | 46 | – | – |
| Period 2 of 2026-27 | 53 | – | – |
| Period 1 of 2026-27 | 60 | 70.4% | 10.0% |
| Period 13 of 2025-26 | 41 | – | – |
| Period 12 of 2025-26 | 43 | – | – |
| Period 11 of 2025-26 | 45 | – | – |
| Period 10 of 2025-26 | 48 | – | – |
| Period 9 of 2025-26 | 63 | 70.7% | 7.9% |
| Period 8 of 2025-26 | 69 | 74.2% | 4.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Selby
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 27,342 | 75.0% | 2.1% |
| TransPennine Express | 13,196 | 73.1% | 2.0% |
| Hull Trains | 4,866 | 70.6% | 1.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out