Northern at Seamer
All trains at SeamerNorthern across BritainYorkshire and The Humber
How this operator is doing here
Northern had 10,822 scheduled stops at Seamer in the 13 periods to Period 7 of 2026-27, 46% of the station's total. 79.0% of recorded arrivals came within three minutes and 4.2% of stops were cancelled.
Northern trains at Seamer also serve Scarborough (4.3 km north, 80.5% on time, 4.2% cancelled), Filey (8.7 km south-east, 80.0% on time, 3.7% cancelled), Hunmanby (9.9 km south-east, 80.0% on time, 3.2% cancelled), Bempton (19.8 km south-east, 67.8% on time, 3.2% cancelled), Bridlington (22.4 km south-east, 79.0% on time, 3.5% cancelled) and Nafferton (25.6 km south, 78.0% on time, 3.6% cancelled), which are the stations on its network closest to Seamer.
Within 30 km of here, Northern runs best at Whitby, 30.0 km north-west (85.3%), and worst at Bempton, 19.8 km south-east (67.8%).
The busiest Northern station within 30 km of Seamer is Bridlington, 22.4 km south-east, with about 66 scheduled stops a day.
Of the 2 operators with enough records at Seamer, Northern is the least punctual, at 79.0%.
Northern at Seamer has slipped sharply. 79.0% of stops came within three minutes of the timetable in the latest 13 periods, 7.4 percentage points worse than the 86.4% recorded in the 13 before. Cancellations fell to 4.2% of scheduled stops from 5.0%, which is 0.8 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 829 | 76.6% | 2.5% |
| Period 6 of 2026-27 | 760 | 63.4% | 3.6% |
| Period 5 of 2026-27 | 832 | 76.8% | 6.5% |
| Period 4 of 2026-27 | 806 | 74.0% | 5.1% |
| Period 3 of 2026-27 | 832 | 72.9% | 3.0% |
| Period 2 of 2026-27 | 832 | 75.7% | 2.3% |
| Period 1 of 2026-27 | 956 | 82.5% | 2.7% |
| Period 13 of 2025-26 | 916 | 86.4% | 2.4% |
| Period 12 of 2025-26 | 832 | 84.7% | 2.6% |
| Period 11 of 2025-26 | 808 | 86.0% | 6.9% |
| Period 10 of 2025-26 | 763 | 83.5% | 7.2% |
| Period 9 of 2025-26 | 828 | 77.1% | 8.6% |
| Period 8 of 2025-26 | 828 | 85.1% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Seamer
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 12,928 | 84.5% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out