Seamer
SEMYorkshire and The HumberManaged by TransPennine Express
How this station is performing
Seamer had 23,750 scheduled stops to Period 7 of 2026-27, about 65 a day. 82.0% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Seamer opened on 8 July 1845, 181 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Seamer is the oldest; the next oldest, Scarborough, dates from 1845.
The nearest stations to Seamer are Scarborough (4.3 km north), Filey (8.7 km south-east), Hunmanby (9.9 km south-east), Bempton (19.8 km south-east) and Bridlington (22.4 km south-east). 3 stations lie within 10 km in all. Of the five, Scarborough is the most punctual at 84.3% and Bempton the least at 67.8%, with Seamer on 82.0%.
Seamer is one of 2 stations named after a Village called Seamer, home to about 4,357 people; this one stands 1.6 km from its centre.
2 operators call at Seamer: TransPennine Express (84.5%, 54% of stops) and Northern (79.0%, 46% of stops). The operator you travel with matters: TransPennine Express reaches 84.5% within three minutes while Northern manages 79.0%, a gap of 5.5 percentage points.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Seamer is the most punctual, at 82.0%. The comparison group includes Adwick (76.2%), Grimsby Town (79.7%) and Bentley (South Yorkshire) (74.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 12,928 | 84.5% | 1.3% |
| Northern | 10,822 | 79.0% | 4.2% |
Operators with their own page for this station are linked to it.
Late train at Seamer? Delay Repay
These operators call at Seamer and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,812 | 77.5% | 1.7% |
| Period 6 of 2026-27 | 1,730 | 75.1% | 2.6% |
| Period 5 of 2026-27 | 1,805 | 80.4% | 4.0% |
| Period 4 of 2026-27 | 1,790 | 77.6% | 3.0% |
| Period 3 of 2026-27 | 1,816 | 79.4% | 2.6% |
| Period 2 of 2026-27 | 1,814 | 79.7% | 2.0% |
| Period 1 of 2026-27 | 2,083 | 84.1% | 2.2% |
| Period 13 of 2025-26 | 2,001 | 86.7% | 1.4% |
| Period 12 of 2025-26 | 1,816 | 86.2% | 1.5% |
| Period 11 of 2025-26 | 1,792 | 87.6% | 3.3% |
| Period 10 of 2025-26 | 1,668 | 86.3% | 3.8% |
| Period 9 of 2025-26 | 1,811 | 78.6% | 5.0% |
| Period 8 of 2025-26 | 1,812 | 86.3% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Adwick | 23,761 | 76.2% | 3.2% |
| Grimsby Town | 23,762 | 79.7% | 3.1% |
| Bentley (South Yorkshire) | 23,723 | 74.5% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out