Northern at Saxilby
How this operator is doing here
Northern had 11,674 scheduled stops at Saxilby in the 13 periods to Period 7 of 2026-27, 79% of the station's total. 76.0% of recorded arrivals came within three minutes and 2.6% of stops were cancelled.
Northern trains at Saxilby also serve Lincoln (9.4 km south-east, 85.3% on time, 2.6% cancelled), Gainsborough Lea Road (15.0 km north-west, 79.3% on time, 2.5% cancelled), Gainsborough Central (16.2 km north-west, – on time, – cancelled), Retford (19.5 km west, 80.3% on time, 2.2% cancelled), Kirton Lindsey (24.7 km north, – on time, – cancelled) and Worksop (30.9 km west, 81.4% on time, 2.0% cancelled), which are the stations on its network closest to Saxilby.
Within 30 km of here, Northern runs best at Lincoln, 9.4 km south-east (85.3%), and worst at Gainsborough Lea Road, 15.0 km north-west (79.3%).
The busiest Northern station within 30 km of Saxilby is Retford, 19.5 km west, with about 38 scheduled stops a day.
Northern at Saxilby has slipped sharply. 76.0% of stops came within three minutes of the timetable in the latest 13 periods, 10.6 percentage points worse than the 86.6% recorded in the 13 before. Cancellations fell to 2.6% of scheduled stops from 5.7%, which is 3.1 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 900 | 73.6% | 2.3% |
| Period 6 of 2026-27 | 900 | 74.9% | 2.3% |
| Period 5 of 2026-27 | 900 | 75.5% | 3.1% |
| Period 4 of 2026-27 | 900 | 75.1% | 5.4% |
| Period 3 of 2026-27 | 900 | 74.6% | 2.7% |
| Period 2 of 2026-27 | 900 | 73.7% | 2.6% |
| Period 1 of 2026-27 | 1,032 | 77.3% | 1.6% |
| Period 13 of 2025-26 | 993 | 77.6% | 1.4% |
| Period 12 of 2025-26 | 724 | 72.5% | 1.5% |
| Period 11 of 2025-26 | 900 | 75.1% | 2.0% |
| Period 10 of 2025-26 | 825 | 76.4% | 4.2% |
| Period 9 of 2025-26 | 900 | 78.9% | 2.7% |
| Period 8 of 2025-26 | 900 | 82.0% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Saxilby
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 3,154 | 88.8% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out