East Midlands Railway at Saxilby
All trains at SaxilbyEast Midlands Railway across BritainEast Midlands
How this operator is doing here
East Midlands Railway had 3,154 scheduled stops at Saxilby in the 13 periods to Period 7 of 2026-27, 21% of the station's total. 88.8% of recorded arrivals came within three minutes and 2.3% of stops were cancelled.
East Midlands Railway trains at Saxilby also serve Hykeham (9.1 km south-east, 84.6% on time, 2.0% cancelled), Lincoln (9.4 km south-east, 88.4% on time, 1.8% cancelled), Swinderby (11.2 km south, 88.3% on time, 2.1% cancelled), Collingham (14.9 km south-west, 84.9% on time, 2.1% cancelled), Gainsborough Lea Road (15.0 km north-west, 89.4% on time, 2.4% cancelled) and Newark Northgate (22.5 km south-west, 92.4% on time, 2.5% cancelled), which are the stations on its network closest to Saxilby.
Within 30 km of here, East Midlands Railway runs best at Newark Northgate, 22.5 km south-west (92.4%), and worst at Market Rasen, 25.3 km north-east (79.4%).
The busiest East Midlands Railway station within 30 km of Saxilby is Lincoln, 9.4 km south-east, with about 95 scheduled stops a day.
Of the 2 operators with enough records at Saxilby, East Midlands Railway is the most punctual, at 88.8%.
East Midlands Railway at Saxilby has edged up: 88.8% of stops came within three minutes of the timetable in the latest 13 periods, 2.8 percentage points better than the 86.0% of the 13 before. Cancellations rose to 2.3% of scheduled stops from 1.5%, which is 0.8 percentage points more.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 240 | 85.7% | 0.8% |
| Period 6 of 2026-27 | 240 | 82.6% | 1.7% |
| Period 5 of 2026-27 | 240 | 92.2% | 4.2% |
| Period 4 of 2026-27 | 240 | 91.8% | 3.8% |
| Period 3 of 2026-27 | 236 | 91.8% | 1.7% |
| Period 2 of 2026-27 | 240 | 90.6% | 2.5% |
| Period 1 of 2026-27 | 280 | 93.5% | 0.4% |
| Period 13 of 2025-26 | 260 | 96.1% | 0.8% |
| Period 12 of 2025-26 | 240 | 93.8% | 0.0% |
| Period 11 of 2025-26 | 238 | 94.4% | 1.7% |
| Period 10 of 2025-26 | 220 | 87.9% | 2.7% |
| Period 9 of 2025-26 | 240 | 73.7% | 6.7% |
| Period 8 of 2025-26 | 240 | 77.9% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Saxilby
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,674 | 76.0% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out