Saxilby
SXYEast MidlandsManaged by East Midlands Railway
How this station is performing
Saxilby had 14,828 scheduled stops to Period 7 of 2026-27, about 41 a day. 78.7% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Saxilby opened on 9 April 1849, 177 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Collingham is the oldest (1846) and Gainsborough Lea Road the newest (1867), with Saxilby in between.
The nearest stations to Saxilby are Hykeham (9.1 km south-east), Lincoln (9.4 km south-east), Swinderby (11.2 km south), Collingham (14.9 km south-west) and Gainsborough Lea Road (15.0 km north-west). 2 stations lie within 10 km in all. At 78.7%, Saxilby is less punctual than all of them; the best of the five, Swinderby, manages 88.3%.
Saxilby takes its name from a Village called Saxilby, home to about 4,428 people, and the station stands 0.7 km from its centre.
2 operators call at Saxilby: Northern (76.0%, 79% of stops) and East Midlands Railway (88.8%, 21% of stops). The operator you travel with matters: East Midlands Railway reaches 88.8% within three minutes while Northern manages 76.0%, a gap of 12.8 percentage points.
2 of 3 stations of a similar size in East Midlands are more punctual than Saxilby on 78.7%. The comparison group includes Gainsborough Lea Road (81.5%), Hucknall (84.3%) and Dronfield (75.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,674 | 76.0% | 2.6% |
| East Midlands Railway | 3,154 | 88.8% | 2.3% |
Operators with their own page for this station are linked to it.
Late train at Saxilby? Delay Repay
These operators call at Saxilby and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,140 | 76.2% | 2.0% |
| Period 6 of 2026-27 | 1,140 | 76.5% | 2.2% |
| Period 5 of 2026-27 | 1,140 | 78.9% | 3.3% |
| Period 4 of 2026-27 | 1,140 | 78.7% | 5.1% |
| Period 3 of 2026-27 | 1,136 | 78.2% | 2.5% |
| Period 2 of 2026-27 | 1,140 | 77.2% | 2.5% |
| Period 1 of 2026-27 | 1,312 | 80.8% | 1.3% |
| Period 13 of 2025-26 | 1,253 | 81.5% | 1.3% |
| Period 12 of 2025-26 | 964 | 77.9% | 1.1% |
| Period 11 of 2025-26 | 1,138 | 79.2% | 1.9% |
| Period 10 of 2025-26 | 1,045 | 78.9% | 3.9% |
| Period 9 of 2025-26 | 1,140 | 77.8% | 3.5% |
| Period 8 of 2025-26 | 1,140 | 81.2% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Gainsborough Lea Road | 14,828 | 81.5% | 2.5% |
| Hucknall | 14,838 | 84.3% | 3.0% |
| Dronfield | 14,866 | 75.3% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out