Sandy
SDYEast of EnglandManaged by Govia Thameslink Railway (Great Northern)
How this station is performing
Sandy had 26,343 scheduled stops to Period 7 of 2026-27, about 72 a day. 84.9% of recorded arrivals were within three minutes of the timetable and 6.0% of scheduled stops were cancelled.
Sandy opened on 7 August 1850, 176 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bedford St Johns is the oldest (1846) and Bedford the newest (1859), with Sandy in between.
The nearest stations to Sandy are Biggleswade (4.6 km south), Arlesey (11.1 km south), St Neots (12.1 km north), Bedford St Johns (12.8 km west) and Bedford (13.6 km west). 1 stations lie within 10 km in all. Of the five, Bedford St Johns is the most punctual at 89.5% and St Neots the least at 82.3%, with Sandy on 84.9%.
Sandy is one of 2 stations named after a market town called Sandy, home to about 12,172 people; this one stands 1.3 km from its centre.
Cancellations are a particular problem at Sandy. 6.0% of scheduled stops did not happen, 2.2 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2252nd of 2,374.
Compared with 3 stations of a similar size in East of England, Sandy is the least punctual, at 84.9%. All of them are ahead, including Ingatestone (89.9%), Brundall (96.3%) and Arlesey (85.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 26,338 | 84.9% | 6.0% |
| Grand Central | 2 | – | – |
| LNER | 2 | – | – |
| Hull Trains | 1 | – | – |
Operators with their own page for this station are linked to it.
Late train at Sandy? Delay Repay
These operators call at Sandy and publish Delay Repay rules.
- GTR: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- Grand Central: pays for a delay of 60 minutes or more, starting at 50% of a single ticket
- LNER: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- Hull Trains: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,055 | 84.0% | 4.7% |
| Period 6 of 2026-27 | 1,994 | 80.0% | 8.1% |
| Period 5 of 2026-27 | 2,050 | 80.9% | 8.2% |
| Period 4 of 2026-27 | 2,056 | 81.2% | 8.5% |
| Period 3 of 2026-27 | 2,054 | 83.7% | 7.8% |
| Period 2 of 2026-27 | 2,057 | 87.6% | 6.3% |
| Period 1 of 2026-27 | 2,379 | 88.5% | 5.4% |
| Period 13 of 2025-26 | 2,191 | 89.1% | 2.2% |
| Period 12 of 2025-26 | 1,741 | 86.1% | 2.9% |
| Period 11 of 2025-26 | 1,936 | 86.1% | 4.3% |
| Period 10 of 2025-26 | 1,838 | 86.8% | 4.6% |
| Period 9 of 2025-26 | 1,938 | 82.8% | 9.8% |
| Period 8 of 2025-26 | 2,054 | 85.7% | 4.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ingatestone | 26,349 | 89.9% | 1.3% |
| Brundall | 26,423 | 96.3% | 0.5% |
| Arlesey | 26,204 | 85.6% | 6.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out