Ingatestone
INTEast of EnglandManaged by Greater Anglia
How this station is performing
Ingatestone had 26,349 scheduled stops to Period 7 of 2026-27, about 72 a day. 89.9% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Ingatestone opened on 12 July 1843. It was moved to the site it uses now on 7 September 1846. Among the 5 stations nearest to it with a known opening date, Brentwood is the oldest (1840) and Wickford the newest (1889), with Ingatestone in between.
The nearest stations to Ingatestone are Billericay (4.9 km south-east), Shenfield (5.5 km south-west), Brentwood (8.3 km south-west), Chelmsford (9.7 km north-east) and Wickford (11.0 km south-east). 4 stations lie within 10 km in all. Of the five, Wickford is the most punctual at 91.2% and Brentwood the least at 87.5%, with Ingatestone on 89.9%.
Ingatestone takes its name from a Village called Ingatestone, home to about 5,409 people, and the station stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Ingatestone was Period 6 of 2025-26, at 72.9%, some time before the latest year. The strongest was Period 12 of 2024-25, at 95.7%, and the two are 22.8 percentage points apart.
1 of 3 stations of a similar size in East of England are more punctual than Ingatestone on 89.9%. The comparison group includes Sandy (84.9%), Brundall (96.3%) and Arlesey (85.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 26,349 | 89.9% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Ingatestone? Delay Repay
These operators call at Ingatestone and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,030 | 89.2% | 1.0% |
| Period 6 of 2026-27 | 2,027 | 86.4% | 0.3% |
| Period 5 of 2026-27 | 1,998 | 84.6% | 3.5% |
| Period 4 of 2026-27 | 2,020 | 89.9% | 2.1% |
| Period 3 of 2026-27 | 2,012 | 88.2% | 0.8% |
| Period 2 of 2026-27 | 2,031 | 90.7% | 0.4% |
| Period 1 of 2026-27 | 2,332 | 90.5% | 2.2% |
| Period 13 of 2025-26 | 2,443 | 91.9% | 1.8% |
| Period 12 of 2025-26 | 1,888 | 91.2% | 0.1% |
| Period 11 of 2025-26 | 1,636 | 92.0% | 0.2% |
| Period 10 of 2025-26 | 1,803 | 91.1% | 1.4% |
| Period 9 of 2025-26 | 2,096 | 92.0% | 0.9% |
| Period 8 of 2025-26 | 2,033 | 90.9% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out