West Midlands Railway at Sandwell and Dudley
All trains at Sandwell and DudleyWest Midlands Railway across BritainWest Midlands
How this operator is doing here
West Midlands Railway had 23,899 scheduled stops at Sandwell and Dudley in the 13 periods to Period 7 of 2026-27, 48% of the station's total. 75.3% of recorded arrivals came within three minutes and 2.8% of stops were cancelled.
West Midlands Railway trains at Sandwell and Dudley also serve Langley Green (1.7 km south, 89.0% on time, 3.6% cancelled), Smethwick Galton Bridge (2.2 km east, 80.1% on time, 3.6% cancelled), Smethwick Rolfe Street (3.1 km south-east, 79.2% on time, 2.7% cancelled), Dudley Port (3.1 km north-west, 74.6% on time, 2.8% cancelled), The Hawthorns (3.1 km east, 87.5% on time, 3.5% cancelled) and Rowley Regis (3.7 km south, 88.2% on time, 3.5% cancelled), which are the stations on its network closest to Sandwell and Dudley.
Within 30 km of here, West Midlands Railway runs best at Stourbridge Town, 10.6 km south-west (100.0%), and worst at Tamworth, 26.2 km north-east (43.1%).
The busiest West Midlands Railway station within 30 km of Sandwell and Dudley is Birmingham New Street, 8.4 km south-east, with about 532 scheduled stops a day.
Of the 3 operators with enough records at Sandwell and Dudley, West Midlands Railway is the most punctual, at 75.3%.
Over three full railway years West Midlands Railway at Sandwell and Dudley has improved each time, from 70.3% within three minutes in 2023-24 to 73.0% in 2024-25 and 76.6% in 2025-26.
Period by period
See how West Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,861 | 74.1% | 1.6% |
| Period 6 of 2026-27 | 1,860 | 74.5% | 2.1% |
| Period 5 of 2026-27 | 1,860 | 72.1% | 2.5% |
| Period 4 of 2026-27 | 1,766 | 67.0% | 5.7% |
| Period 3 of 2026-27 | 1,666 | 76.8% | 2.6% |
| Period 2 of 2026-27 | 1,770 | 77.2% | 2.3% |
| Period 1 of 2026-27 | 2,147 | 80.6% | 2.2% |
| Period 13 of 2025-26 | 1,854 | 80.8% | 6.2% |
| Period 12 of 2025-26 | 1,856 | 81.6% | 0.8% |
| Period 11 of 2025-26 | 1,855 | 81.3% | 5.3% |
| Period 10 of 2025-26 | 1,688 | 77.8% | 2.0% |
| Period 9 of 2025-26 | 1,858 | 64.5% | 1.4% |
| Period 8 of 2025-26 | 1,858 | 70.6% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Sandwell and Dudley
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 14,583 | 59.4% | 7.3% |
| Transport for Wales | 11,557 | 67.5% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out