Avanti at Sandwell and Dudley
All trains at Sandwell and DudleyAvanti across BritainWest Midlands
How this operator is doing here
Avanti had 14,583 scheduled stops at Sandwell and Dudley in the 13 periods to Period 7 of 2026-27, 29% of the station's total. 59.4% of recorded arrivals came within three minutes and 7.3% of stops were cancelled.
Avanti trains at Sandwell and Dudley also serve Birmingham New Street (8.4 km south-east, 53.6% on time, 9.2% cancelled), Wolverhampton (11.5 km north-west, 62.1% on time, 6.2% cancelled), Birmingham International (20.4 km east, 56.8% on time, 8.5% cancelled), Lichfield Trent Valley (24.4 km north-east, 45.5% on time, 8.1% cancelled), Tamworth (26.2 km north-east, 45.6% on time, 8.2% cancelled) and Rugeley Trent Valley (29.5 km north, – on time, – cancelled), which are the stations on its network closest to Sandwell and Dudley.
Within 30 km of here, Avanti runs best at Wolverhampton, 11.5 km north-west (62.1%), and worst at Lichfield Trent Valley, 24.4 km north-east (45.5%).
The busiest Avanti station within 30 km of Sandwell and Dudley is Birmingham New Street, 8.4 km south-east, with about 89 scheduled stops a day.
Avanti at Sandwell and Dudley has slipped sharply. 59.4% of stops came within three minutes of the timetable in the latest 13 periods, 6.0 percentage points worse than the 65.4% recorded in the 13 before. Cancellations rose to 7.3% of scheduled stops from 5.2%, which is 2.1 percentage points more.
Period by period
See how Avanti Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,119 | 59.0% | 4.4% |
| Period 6 of 2026-27 | 1,112 | 54.0% | 4.1% |
| Period 5 of 2026-27 | 1,116 | 53.0% | 6.5% |
| Period 4 of 2026-27 | 1,116 | 47.1% | 14.2% |
| Period 3 of 2026-27 | 1,097 | 62.3% | 6.7% |
| Period 2 of 2026-27 | 1,090 | 62.7% | 8.3% |
| Period 1 of 2026-27 | 1,257 | 68.8% | 4.5% |
| Period 13 of 2025-26 | 1,101 | 65.0% | 8.4% |
| Period 12 of 2025-26 | 1,155 | 66.0% | 6.2% |
| Period 11 of 2025-26 | 1,134 | 66.8% | 9.3% |
| Period 10 of 2025-26 | 1,006 | 61.4% | 7.5% |
| Period 9 of 2025-26 | 1,158 | 46.3% | 10.3% |
| Period 8 of 2025-26 | 1,122 | 57.8% | 5.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Sandwell and Dudley
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 23,899 | 75.3% | 2.8% |
| Transport for Wales | 11,557 | 67.5% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out