Sandbach
SDBNorth WestManaged by Northern Trains
How this station is performing
Sandbach had 21,001 scheduled stops to Period 7 of 2026-27, about 58 a day. 82.0% of recorded arrivals were within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
Sandbach opened on 10 May 1842, 184 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Crewe is the oldest (1837) and Goostrey the newest (1891), with Sandbach in between.
The nearest stations to Sandbach are Holmes Chapel (6.1 km north-east), Crewe (7.3 km south), Winsford (8.1 km north-west), Alsager (9.0 km south-east) and Goostrey (9.2 km north-east). 5 stations lie within 10 km in all. Of the five, Goostrey is the most punctual at 82.5% and Winsford the least at 63.9%, with Sandbach on 82.0%.
Sandbach takes its name from a market town called Sandbach, home to about 21,923 people, and the station stands 1.8 km from its centre.
Across the whole run of data, the weakest four-week period for Sandbach was Period 9 of 2023-24, at 71.7%, some time before the latest year. The strongest was Period 1 of 2023-24, at 90.6%, and the two are 18.9 percentage points apart. Cancellations peaked at 8.7% of scheduled stops in Period 8 of 2024-25, against 2.2% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Sandbach is the most punctual, at 82.0%. The comparison group includes Holmes Chapel (79.6%), Castleton (Manchester) (74.0%) and Bromley Cross (Lancs) (69.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 20,998 | 82.0% | 2.2% |
| Transport for Wales | 3 | – | – |
Operators with their own page for this station are linked to it.
Late train at Sandbach? Delay Repay
These operators call at Sandbach and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,592 | 83.2% | 1.8% |
| Period 6 of 2026-27 | 1,592 | 83.5% | 1.0% |
| Period 5 of 2026-27 | 1,604 | 82.1% | 1.2% |
| Period 4 of 2026-27 | 1,592 | 81.6% | 1.5% |
| Period 3 of 2026-27 | 1,592 | 81.0% | 1.6% |
| Period 2 of 2026-27 | 1,605 | 83.2% | 2.4% |
| Period 1 of 2026-27 | 1,838 | 87.0% | 3.9% |
| Period 13 of 2025-26 | 1,738 | 85.5% | 1.2% |
| Period 12 of 2025-26 | 1,590 | 85.9% | 1.9% |
| Period 11 of 2025-26 | 1,604 | 83.6% | 4.2% |
| Period 10 of 2025-26 | 1,459 | 81.8% | 3.8% |
| Period 9 of 2025-26 | 1,591 | 71.7% | 2.9% |
| Period 8 of 2025-26 | 1,604 | 75.3% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Holmes Chapel | 20,946 | 79.6% | 2.0% |
| Castleton (Manchester) | 21,117 | 74.0% | 4.4% |
| Bromley Cross (Lancs) | 20,862 | 69.5% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out