Holmes Chapel
HCHNorth WestManaged by Northern Trains
How this station is performing
Holmes Chapel had 20,946 scheduled stops to Period 7 of 2026-27, about 58 a day. 79.6% of recorded arrivals were within three minutes of the timetable and 2.0% of scheduled stops were cancelled.
Holmes Chapel opened on 10 May 1842, 184 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Winsford is the oldest (1837) and Goostrey the newest (1891), with Holmes Chapel in between.
The nearest stations to Holmes Chapel are Goostrey (3.1 km north-east), Sandbach (6.1 km south-west), Chelford (Cheshire) (9.2 km north-east), Plumley (9.6 km north-west) and Winsford (9.6 km west). 5 stations lie within 10 km in all. Of the five, Goostrey is the most punctual at 82.5% and Winsford the least at 63.9%, with Holmes Chapel on 79.6%.
Holmes Chapel takes its name from a Village called Holmes Chapel, home to about 6,667 people, and the station stands 0.5 km from its centre.
Across the whole run of data, the weakest four-week period for Holmes Chapel was Period 9 of 2023-24, at 68.4%, some time before the latest year. The strongest was Period 1 of 2023-24, at 88.8%, and the two are 20.4 percentage points apart. Cancellations peaked at 8.7% of scheduled stops in Period 8 of 2024-25, against 2.0% over the latest 13 periods.
1 of 3 stations of a similar size in North West are more punctual than Holmes Chapel on 79.6%. The comparison group includes Sandbach (82.0%), Bromley Cross (Lancs) (69.5%) and Darwen (70.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 20,946 | 79.6% | 2.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,588 | 80.1% | 1.7% |
| Period 6 of 2026-27 | 1,588 | 79.7% | 0.9% |
| Period 5 of 2026-27 | 1,600 | 81.0% | 1.2% |
| Period 4 of 2026-27 | 1,588 | 78.8% | 0.9% |
| Period 3 of 2026-27 | 1,588 | 79.4% | 1.6% |
| Period 2 of 2026-27 | 1,600 | 79.9% | 2.1% |
| Period 1 of 2026-27 | 1,835 | 84.9% | 3.8% |
| Period 13 of 2025-26 | 1,732 | 83.3% | 1.0% |
| Period 12 of 2025-26 | 1,586 | 83.9% | 1.1% |
| Period 11 of 2025-26 | 1,600 | 80.4% | 4.2% |
| Period 10 of 2025-26 | 1,454 | 80.5% | 3.6% |
| Period 9 of 2025-26 | 1,587 | 68.6% | 2.8% |
| Period 8 of 2025-26 | 1,600 | 73.9% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Sandbach | 21,001 | 82.0% | 2.2% |
| Bromley Cross (Lancs) | 20,862 | 69.5% | 3.2% |
| Darwen | 20,862 | 70.3% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out