Northern at Sandbach
How this operator is doing here
Northern had 20,998 scheduled stops at Sandbach in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 82.0% of recorded arrivals came within three minutes and 2.2% of stops were cancelled.
Northern trains at Sandbach also serve Holmes Chapel (6.1 km north-east, 79.6% on time, 2.0% cancelled), Crewe (7.3 km south, 80.2% on time, 2.3% cancelled), Goostrey (9.2 km north-east, 82.5% on time, 2.1% cancelled), Kidsgrove (12.2 km south-east, 75.8% on time, 2.6% cancelled), Congleton (13.4 km east, 78.1% on time, 2.5% cancelled) and Lostock Gralam (13.9 km north, 80.5% on time, 2.4% cancelled), which are the stations on its network closest to Sandbach.
Within 30 km of here, Northern runs best at Delamere, 20.2 km north-west (87.0%), and worst at Gatley, 29.1 km north (64.9%).
The busiest Northern station within 30 km of Sandbach is Manchester Airport, 25.2 km north, with about 154 scheduled stops a day.
Of the 1 operators with enough records at Sandbach, Northern is the most punctual, at 82.0%.
For Northern, Sandbach is the 197th best of 493 ranked stations. Its 82.0% here is 3.4 percentage points above the 78.6% across the whole network.
Over three full railway years Northern at Sandbach has got worse each time, from 84.6% within three minutes in 2023-24 to 83.9% in 2024-25 and 81.0% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,592 | 83.2% | 1.8% |
| Period 6 of 2026-27 | 1,592 | 83.5% | 1.0% |
| Period 5 of 2026-27 | 1,604 | 82.1% | 1.2% |
| Period 4 of 2026-27 | 1,592 | 81.6% | 1.5% |
| Period 3 of 2026-27 | 1,592 | 81.0% | 1.6% |
| Period 2 of 2026-27 | 1,604 | 83.3% | 2.4% |
| Period 1 of 2026-27 | 1,838 | 87.0% | 3.9% |
| Period 13 of 2025-26 | 1,737 | 85.6% | 1.2% |
| Period 12 of 2025-26 | 1,590 | 85.9% | 1.9% |
| Period 11 of 2025-26 | 1,604 | 83.6% | 4.2% |
| Period 10 of 2025-26 | 1,458 | 81.8% | 3.8% |
| Period 9 of 2025-26 | 1,591 | 71.7% | 2.9% |
| Period 8 of 2025-26 | 1,604 | 75.3% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Sandbach
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 3 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out