South Western Railway at Salisbury
All trains at SalisburySouth Western Railway across BritainSouth West
How this operator is doing here
South Western Railway had 39,613 scheduled stops at Salisbury in the 13 periods to Period 7 of 2026-27, 68% of the station's total. 72.7% of recorded arrivals came within three minutes and 2.0% of stops were cancelled.
South Western Railway trains at Salisbury also serve Dean (Wilts) (12.5 km east, 77.0% on time, 1.7% cancelled), Grateley (17.1 km north-east, 81.8% on time, 2.1% cancelled), Mottisfont and Dunbridge (18.6 km east, 76.9% on time, 1.7% cancelled), Tisbury (19.1 km west, 65.6% on time, 3.2% cancelled), Romsey (23.6 km east, 74.3% on time, 2.4% cancelled) and Andover (26.9 km north-east, 74.8% on time, 2.5% cancelled), which are the stations on its network closest to Salisbury.
Within 30 km of here, South Western Railway runs best at Grateley, 17.1 km north-east (81.8%), and worst at Tisbury, 19.1 km west (65.6%).
The busiest South Western Railway station within 30 km of Salisbury is Romsey, 23.6 km east, with about 69 scheduled stops a day.
South Western Railway at Salisbury has slipped a little, from 76.5% within three minutes in the previous 13 periods to 72.7% in the latest 13, a fall of 3.8 percentage points. Cancellations held steady at 2.0% of scheduled stops, against 1.6% before.
Period by period
See how South Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,861 | 72.0% | 1.5% |
| Period 6 of 2026-27 | 3,110 | 75.6% | 0.7% |
| Period 5 of 2026-27 | 3,106 | 65.8% | 2.9% |
| Period 4 of 2026-27 | 3,041 | 62.5% | 2.9% |
| Period 3 of 2026-27 | 3,066 | 74.0% | 2.7% |
| Period 2 of 2026-27 | 2,986 | 66.5% | 3.1% |
| Period 1 of 2026-27 | 3,406 | 77.8% | 1.8% |
| Period 13 of 2025-26 | 3,396 | 78.4% | 1.1% |
| Period 12 of 2025-26 | 3,062 | 82.5% | 1.2% |
| Period 11 of 2025-26 | 3,068 | 75.5% | 2.5% |
| Period 10 of 2025-26 | 2,811 | 72.8% | 2.3% |
| Period 9 of 2025-26 | 2,791 | 67.3% | 1.3% |
| Period 8 of 2025-26 | 2,909 | 72.3% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Salisbury
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 18,259 | 70.5% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out