Great Western Railway at Salisbury
All trains at SalisburyGreat Western Railway across BritainSouth West
How this operator is doing here
Great Western Railway had 18,259 scheduled stops at Salisbury in the 13 periods to Period 7 of 2026-27, 32% of the station's total. 70.5% of recorded arrivals came within three minutes and 5.0% of stops were cancelled.
Great Western Railway trains at Salisbury also serve Romsey (23.6 km east, 65.3% on time, 3.8% cancelled), Warminster (30.0 km north-west, 71.4% on time, 5.4% cancelled), Pewsey (30.3 km north, 49.1% on time, 4.6% cancelled), Chandlers Ford (31.0 km east, 58.5% on time, 1.4% cancelled), Southampton Central (32.9 km south-east, 59.7% on time, 4.0% cancelled) and Southampton Airport Parkway (33.7 km south-east, – on time, – cancelled), which are the stations on its network closest to Salisbury.
The busiest Great Western Railway station within 30 km of Salisbury is Warminster, 30.0 km north-west, with about 57 scheduled stops a day.
Of the 2 operators with enough records at Salisbury, Great Western Railway is the least punctual, at 70.5%.
Great Western Railway at Salisbury has slipped a little, from 74.8% within three minutes in the previous 13 periods to 70.5% in the latest 13, a fall of 4.3 percentage points. Cancellations fell to 5.0% of scheduled stops from 6.5%, which is 1.5 percentage points fewer.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,334 | 63.3% | 4.0% |
| Period 6 of 2026-27 | 1,427 | 64.9% | 3.3% |
| Period 5 of 2026-27 | 1,309 | 63.0% | 6.0% |
| Period 4 of 2026-27 | 1,431 | 61.3% | 7.6% |
| Period 3 of 2026-27 | 1,384 | 69.5% | 9.3% |
| Period 2 of 2026-27 | 1,384 | 69.6% | 6.9% |
| Period 1 of 2026-27 | 1,570 | 77.1% | 2.3% |
| Period 13 of 2025-26 | 1,563 | 80.4% | 3.1% |
| Period 12 of 2025-26 | 1,397 | 82.0% | 1.7% |
| Period 11 of 2025-26 | 1,430 | 81.8% | 4.0% |
| Period 10 of 2025-26 | 1,293 | 69.1% | 5.0% |
| Period 9 of 2025-26 | 1,372 | 60.9% | 5.0% |
| Period 8 of 2025-26 | 1,365 | 69.1% | 8.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Salisbury
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 39,613 | 72.7% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out