How this station is performing
Aldrington had 17,939 scheduled stops to Period 7 of 2026-27, about 49 a day. 83.7% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Aldrington opened on 3 September 1905. It was moved to the site it uses now on 17 June 1932. Of the 5 stations nearest to it with a known opening date, Aldrington is the newest; the oldest, Portslade, opened in 1840.
The nearest stations to Aldrington are Hove (0.9 km east), Portslade (1.6 km west), Preston Park (2.2 km north-east), Fishersgate (2.6 km west) and Brighton (3.0 km east). 11 stations lie within 10 km in all. Of the five, Fishersgate is the most punctual at 84.7% and Preston Park the least at 76.3%, with Aldrington on 83.7%.
Aldrington takes its name from a suburb called Aldrington, and the station stands 1.0 km from its centre.
Aldrington has slipped a little, from 87.2% within three minutes in the previous 13 periods to 83.7% in the latest 13, a fall of 3.5 percentage points. Cancellations held steady at 2.4% of scheduled stops, against 2.1% before.
1 of 3 stations of a similar size in South East are more punctual than Aldrington on 83.7%. The comparison group includes Barming (80.9%), East Malling (82.4%) and Fishersgate (84.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 17,939 | 83.7% | 2.4% |
Operators with their own page for this station are linked to it.
Late train at Aldrington? Delay Repay
These operators call at Aldrington and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,372 | 77.3% | 2.3% |
| Period 6 of 2026-27 | 1,396 | 80.9% | 2.7% |
| Period 5 of 2026-27 | 1,389 | 81.7% | 2.6% |
| Period 4 of 2026-27 | 1,386 | 84.6% | 1.9% |
| Period 3 of 2026-27 | 1,391 | 81.6% | 2.4% |
| Period 2 of 2026-27 | 1,343 | 84.4% | 5.5% |
| Period 1 of 2026-27 | 1,501 | 85.3% | 2.6% |
| Period 13 of 2025-26 | 1,469 | 87.2% | 3.3% |
| Period 12 of 2025-26 | 1,411 | 88.1% | 1.9% |
| Period 11 of 2025-26 | 1,388 | 87.6% | 1.6% |
| Period 10 of 2025-26 | 1,253 | 84.7% | 0.8% |
| Period 9 of 2025-26 | 1,301 | 81.2% | 1.5% |
| Period 8 of 2025-26 | 1,339 | 82.5% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barming | 17,939 | 80.9% | 1.2% |
| East Malling | 17,939 | 82.4% | 1.2% |
| Fishersgate | 17,939 | 84.7% | 2.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out