West Midlands Railway at Rugby
All trains at RugbyWest Midlands Railway across BritainWest Midlands
How this operator is doing here
West Midlands Railway had 38,173 scheduled stops at Rugby in the 13 periods to Period 7 of 2026-27, 59% of the station's total. 67.9% of recorded arrivals came within three minutes and 4.0% of stops were cancelled.
West Midlands Railway trains at Rugby also serve Long Buckby (14.6 km south-east, 73.7% on time, 5.0% cancelled), Coventry (18.0 km west, 71.7% on time, 4.7% cancelled), Coventry Arena (18.2 km north-west, 85.9% on time, 5.8% cancelled), Bedworth (18.5 km north-west, 87.9% on time, 5.8% cancelled), Canley (20.3 km west, 69.0% on time, 5.7% cancelled) and Bermuda Park (20.4 km north-west, 88.6% on time, 5.8% cancelled), which are the stations on its network closest to Rugby.
Within 30 km of here, West Midlands Railway runs best at Bermuda Park, 20.4 km north-west (88.6%), and worst at Canley, 20.3 km west (69.0%).
The busiest West Midlands Railway station within 30 km of Rugby is Coventry, 18.0 km west, with about 107 scheduled stops a day.
West Midlands Railway at Rugby has slipped a little, from 72.5% within three minutes in the previous 13 periods to 67.9% in the latest 13, a fall of 4.6 percentage points. Cancellations rose to 4.0% of scheduled stops from 3.4%, which is 0.6 percentage points more.
Period by period
See how West Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,931 | 71.0% | 3.5% |
| Period 6 of 2026-27 | 2,934 | 61.3% | 5.4% |
| Period 5 of 2026-27 | 2,937 | 64.4% | 6.5% |
| Period 4 of 2026-27 | 2,806 | 57.6% | 7.2% |
| Period 3 of 2026-27 | 2,801 | 67.5% | 4.1% |
| Period 2 of 2026-27 | 2,781 | 67.1% | 5.6% |
| Period 1 of 2026-27 | 3,366 | 77.0% | 1.5% |
| Period 13 of 2025-26 | 3,239 | 75.4% | 1.8% |
| Period 12 of 2025-26 | 2,937 | 71.5% | 2.1% |
| Period 11 of 2025-26 | 2,901 | 72.3% | 3.2% |
| Period 10 of 2025-26 | 2,670 | 66.4% | 3.7% |
| Period 9 of 2025-26 | 2,936 | 62.7% | 3.9% |
| Period 8 of 2025-26 | 2,934 | 64.5% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Rugby
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 26,826 | 55.6% | 4.8% |
| Caledonian Sleeper | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out