Avanti at Rugby
How this operator is doing here
Avanti had 26,826 scheduled stops at Rugby in the 13 periods to Period 7 of 2026-27, 41% of the station's total. 55.6% of recorded arrivals came within three minutes and 4.8% of stops were cancelled.
Avanti trains at Rugby also serve Coventry (18.0 km west, 53.5% on time, 7.7% cancelled), Nuneaton (21.9 km north-west, 50.1% on time, 8.0% cancelled), Northampton (28.2 km south-east, 71.7% on time, 1.6% cancelled), Birmingham International (33.2 km west, 56.8% on time, 8.5% cancelled), Tamworth (41.2 km north-west, 45.6% on time, 8.2% cancelled) and Birmingham New Street (45.3 km west, 53.6% on time, 9.2% cancelled), which are the stations on its network closest to Rugby.
The busiest Avanti station within 30 km of Rugby is Coventry, 18.0 km west, with about 83 scheduled stops a day.
Of the 2 operators with enough records at Rugby, Avanti is the least punctual, at 55.6%.
For Avanti, Rugby ranks 21st of 42 stations and is typical: 55.6% here against 55.2% across the network, a difference of 0.4 percentage points.
Avanti at Rugby has slipped a little, from 58.4% within three minutes in the previous 13 periods to 55.6% in the latest 13, a fall of 2.8 percentage points. Cancellations rose to 4.8% of scheduled stops from 2.7%, which is 2.1 percentage points more.
Period by period
See how Avanti Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,061 | 57.6% | 2.9% |
| Period 6 of 2026-27 | 1,950 | 47.2% | 1.6% |
| Period 5 of 2026-27 | 1,730 | 47.5% | 7.0% |
| Period 4 of 2026-27 | 1,957 | 44.7% | 10.8% |
| Period 3 of 2026-27 | 1,955 | 52.7% | 4.2% |
| Period 2 of 2026-27 | 2,009 | 52.2% | 5.0% |
| Period 1 of 2026-27 | 2,428 | 64.7% | 3.4% |
| Period 13 of 2025-26 | 2,228 | 67.8% | 3.6% |
| Period 12 of 2025-26 | 2,025 | 62.4% | 3.1% |
| Period 11 of 2025-26 | 2,149 | 61.5% | 5.1% |
| Period 10 of 2025-26 | 2,241 | 61.5% | 5.1% |
| Period 9 of 2025-26 | 2,053 | 46.5% | 6.8% |
| Period 8 of 2025-26 | 2,040 | 50.1% | 4.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Rugby
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 38,173 | 67.9% | 4.0% |
| Caledonian Sleeper | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out