Rowlands Castle
RLNSouth EastManaged by South Western Railway
How this station is performing
Rowlands Castle had 15,662 scheduled stops to Period 7 of 2026-27, about 43 a day. 78.4% of recorded arrivals were within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
Rowlands Castle opened on 1 January 1859, 167 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Havant is the oldest (1847) and Warblington the newest (1907), with Rowlands Castle in between.
The nearest stations to Rowlands Castle are Warblington (4.4 km south), Havant (4.6 km south), Emsworth (4.8 km south), Bedhampton (5.1 km south-west) and Southbourne (6.0 km south-east). 8 stations lie within 10 km in all. At 78.4%, Rowlands Castle is more punctual than every one of them; the best of the five, Bedhampton, manages 77.9%.
Rowlands Castle takes its name from a Village called Rowlands Castle, home to about 3,190 people, and the station stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Rowlands Castle was Period 9 of 2024-25, at 62.8%, some time before the latest year. The strongest was Period 6 of 2023-24, at 92.4%, and the two are 29.6 percentage points apart. Cancellations peaked at 6.7% of scheduled stops in Period 2 of 2026-27, against 3.2% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Rowlands Castle is the least punctual, at 78.4%. All of them are ahead, including Milford (Surrey) (85.1%), Witley (83.3%) and Whitchurch (Hampshire) (80.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 15,662 | 78.4% | 3.2% |
Operators with their own page for this station are linked to it.
Late train at Rowlands Castle? Delay Repay
These operators call at Rowlands Castle and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,315 | 77.8% | 3.5% |
| Period 6 of 2026-27 | 1,256 | 78.5% | 2.1% |
| Period 5 of 2026-27 | 1,272 | 80.6% | 2.9% |
| Period 4 of 2026-27 | 1,262 | 81.3% | 2.9% |
| Period 3 of 2026-27 | 1,256 | 84.9% | 2.9% |
| Period 2 of 2026-27 | 1,248 | 74.1% | 6.7% |
| Period 1 of 2026-27 | 1,342 | 85.4% | 3.1% |
| Period 13 of 2025-26 | 1,401 | 85.5% | 2.1% |
| Period 12 of 2025-26 | 889 | 80.9% | 3.8% |
| Period 11 of 2025-26 | 1,258 | 78.4% | 2.5% |
| Period 10 of 2025-26 | 1,131 | 66.3% | 4.0% |
| Period 9 of 2025-26 | 1,250 | 65.6% | 2.4% |
| Period 8 of 2025-26 | 782 | 76.9% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Milford (Surrey) | 15,696 | 85.1% | 4.0% |
| Witley | 15,696 | 83.3% | 3.9% |
| Whitchurch (Hampshire) | 15,700 | 80.6% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out