Witley
WTYSouth EastManaged by South Western Railway
How this station is performing
Witley had 15,696 scheduled stops to Period 7 of 2026-27, about 43 a day. 83.3% of recorded arrivals were within three minutes of the timetable and 3.9% of scheduled stops were cancelled.
Witley opened on 1 January 1859, 167 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Shalford (Surrey) is the oldest (1849) and Farncombe the newest (1897), with Witley in between.
The nearest stations to Witley are Milford (Surrey) (3.4 km north), Godalming (6.2 km north), Haslemere (7.1 km south-west), Farncombe (7.7 km north) and Shalford (Surrey) (10.6 km north-east). 4 stations lie within 10 km in all. Of the five, Milford (Surrey) is the most punctual at 85.1% and Haslemere the least at 75.5%, with Witley on 83.3%.
Witley is one of 3 stations named after a Village called Witley, home to about 8,130 people; this one stands 1.8 km from its centre.
Across the whole run of data, the weakest four-week period for Witley was Period 9 of 2024-25, at 71.6%, some time before the latest year. The strongest was Period 5 of 2023-24, at 93.1%, and the two are 21.5 percentage points apart. Cancellations peaked at 10.6% of scheduled stops in Period 2 of 2026-27, against 3.9% over the latest 13 periods.
1 of 3 stations of a similar size in South East are more punctual than Witley on 83.3%. The comparison group includes Milford (Surrey) (85.1%), Whitchurch (Hampshire) (80.6%) and Overton (81.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 15,696 | 83.3% | 3.9% |
Operators with their own page for this station are linked to it.
Late train at Witley? Delay Repay
These operators call at Witley and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,202 | 79.5% | 4.7% |
| Period 6 of 2026-27 | 1,256 | 82.2% | 2.0% |
| Period 5 of 2026-27 | 1,271 | 83.6% | 3.5% |
| Period 4 of 2026-27 | 1,272 | 84.7% | 3.6% |
| Period 3 of 2026-27 | 1,235 | 86.8% | 2.8% |
| Period 2 of 2026-27 | 1,237 | 80.1% | 10.6% |
| Period 1 of 2026-27 | 1,440 | 87.8% | 3.3% |
| Period 13 of 2025-26 | 1,402 | 88.7% | 1.9% |
| Period 12 of 2025-26 | 1,193 | 86.8% | 3.9% |
| Period 11 of 2025-26 | 1,190 | 84.8% | 3.3% |
| Period 10 of 2025-26 | 1,114 | 77.8% | 4.8% |
| Period 9 of 2025-26 | 1,161 | 74.4% | 2.9% |
| Period 8 of 2025-26 | 723 | 81.4% | 4.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Milford (Surrey) | 15,696 | 85.1% | 4.0% |
| Whitchurch (Hampshire) | 15,700 | 80.6% | 2.2% |
| Overton | 15,701 | 81.6% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out