Romiley
RMLNorth WestManaged by Northern Trains
How this station is performing
Romiley had 36,175 scheduled stops to Period 7 of 2026-27, about 99 a day. 87.1% of recorded arrivals were within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Romiley opened on 5 August 1862, 164 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Romiley is the oldest; the next oldest, Woodley, dates from 1862.
The nearest stations to Romiley are Bredbury (1.7 km north-west), Woodley (1.7 km north), Rose Hill Marple (2.2 km south-east), Marple (2.6 km south-east) and Brinnington (3.6 km north-west). 45 stations lie within 10 km in all. Of the five, Rose Hill Marple is the most punctual at 93.3% and Marple the least at 83.3%, with Romiley on 87.1%.
Romiley takes its name from an urban area called Romiley, home to about 10,900 people, and the station stands 0.5 km from its centre.
Across the whole run of data, the weakest four-week period for Romiley was Period 9 of 2023-24, at 73.2%, some time before the latest year. The strongest was Period 3 of 2024-25, at 94.1%, and the two are 20.9 percentage points apart. Cancellations peaked at 10.5% of scheduled stops in Period 10 of 2024-25, against 2.3% over the latest 13 periods.
1 of 3 stations of a similar size in North West are more punctual than Romiley on 87.1%. The comparison group includes Accrington (76.2%), Guide Bridge (87.6%) and Heald Green (67.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 36,175 | 87.1% | 2.3% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,840 | 86.5% | 2.8% |
| Period 6 of 2026-27 | 2,824 | 88.3% | 1.2% |
| Period 5 of 2026-27 | 2,728 | 84.6% | 2.3% |
| Period 4 of 2026-27 | 2,823 | 85.6% | 1.6% |
| Period 3 of 2026-27 | 2,541 | 86.1% | 1.2% |
| Period 2 of 2026-27 | 2,822 | 87.3% | 3.5% |
| Period 1 of 2026-27 | 3,275 | 88.9% | 3.4% |
| Period 13 of 2025-26 | 3,058 | 92.8% | 0.9% |
| Period 12 of 2025-26 | 2,261 | 88.9% | 1.3% |
| Period 11 of 2025-26 | 2,795 | 91.8% | 1.3% |
| Period 10 of 2025-26 | 2,567 | 88.1% | 4.5% |
| Period 9 of 2025-26 | 2,805 | 79.0% | 4.0% |
| Period 8 of 2025-26 | 2,836 | 84.1% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Accrington | 36,219 | 76.2% | 3.5% |
| Guide Bridge | 36,082 | 87.6% | 2.1% |
| Heald Green | 35,671 | 67.6% | 6.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out