Heald Green
HDGNorth WestManaged by Northern Trains
How this station is performing
Heald Green had 35,671 scheduled stops to Period 7 of 2026-27, about 98 a day. 67.6% of recorded arrivals were within three minutes of the timetable and 6.7% of scheduled stops were cancelled.
Heald Green opened on 1 May 1909, 117 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Handforth is the oldest (1842) and Manchester Airport the newest (1993), with Heald Green in between.
The nearest stations to Heald Green are Styal (2.4 km south), Manchester Airport (2.4 km west), Gatley (2.7 km north), Handforth (3.0 km south-east) and Cheadle Hulme (3.3 km east). 26 stations lie within 10 km in all. Of the five, Handforth is the most punctual at 85.3% and Gatley the least at 65.4%, with Heald Green on 67.6%.
Heald Green takes its name from a suburb called Heald Green, home to about 12,640 people, and the station stands 1.3 km from its centre.
Compared with 3 stations of a similar size in North West, Heald Green is the least punctual, at 67.6%. All of them are ahead, including St Helens Central (87.9%), Leyland (75.9%) and Guide Bridge (87.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 35,670 | 67.6% | 6.7% |
| TransPennine Express | 1 | – | – |
Operators with their own page for this station are linked to it.
Late train at Heald Green? Delay Repay
These operators call at Heald Green and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,790 | 67.7% | 6.2% |
| Period 6 of 2026-27 | 2,809 | 70.1% | 4.6% |
| Period 5 of 2026-27 | 2,792 | 69.1% | 6.4% |
| Period 4 of 2026-27 | 2,776 | 68.6% | 7.1% |
| Period 3 of 2026-27 | 2,692 | 67.4% | 7.9% |
| Period 2 of 2026-27 | 2,780 | 70.5% | 5.6% |
| Period 1 of 2026-27 | 3,163 | 71.0% | 5.9% |
| Period 13 of 2025-26 | 3,023 | 71.5% | 6.6% |
| Period 12 of 2025-26 | 1,951 | 71.0% | 5.5% |
| Period 11 of 2025-26 | 2,750 | 69.3% | 4.5% |
| Period 10 of 2025-26 | 2,530 | 65.0% | 7.9% |
| Period 9 of 2025-26 | 2,813 | 55.6% | 12.1% |
| Period 8 of 2025-26 | 2,802 | 61.6% | 6.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| St Helens Central | 35,447 | 87.9% | 3.0% |
| Leyland | 35,403 | 75.9% | 4.2% |
| Guide Bridge | 36,082 | 87.6% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out