Accrington
ACRNorth WestManaged by Northern Trains
How this station is performing
Accrington had 36,219 scheduled stops to Period 7 of 2026-27, about 100 a day. 76.2% of recorded arrivals were within three minutes of the timetable and 3.5% of scheduled stops were cancelled.
Accrington opened on 19 June 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Accrington is the oldest; the next oldest, Church and Oswaldtwistle, dates from 1848.
The nearest stations to Accrington are Church and Oswaldtwistle (1.4 km west), Huncoat (2.6 km north-east), Rishton (3.5 km west), Hapton (4.7 km north-east) and Rose Grove (6.9 km north-east). 14 stations lie within 10 km in all. Of the five, Rishton is the most punctual at 82.1% and Rose Grove the least at 75.4%, with Accrington on 76.2%.
Accrington takes its name from a town called Accrington, home to about 35,456 people, and the station stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Accrington was Period 9 of 2023-24, at 62.6%, some time before the latest year. The strongest was Period 1 of 2023-24, at 88.7%, and the two are 26.1 percentage points apart. Cancellations peaked at 9.5% of scheduled stops in Period 4 of 2024-25, against 3.5% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Accrington is the least punctual, at 76.2%. All of them are ahead, including Romiley (87.1%), Guide Bridge (87.6%) and Wavertree Technology Park (80.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 36,219 | 76.2% | 3.5% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,812 | 74.4% | 2.4% |
| Period 6 of 2026-27 | 2,791 | 80.6% | 2.3% |
| Period 5 of 2026-27 | 2,728 | 78.2% | 4.1% |
| Period 4 of 2026-27 | 2,743 | 76.0% | 5.2% |
| Period 3 of 2026-27 | 2,668 | 77.1% | 3.1% |
| Period 2 of 2026-27 | 2,812 | 74.3% | 4.2% |
| Period 1 of 2026-27 | 3,238 | 82.2% | 3.8% |
| Period 13 of 2025-26 | 3,080 | 80.0% | 2.8% |
| Period 12 of 2025-26 | 2,808 | 75.8% | 2.3% |
| Period 11 of 2025-26 | 2,808 | 79.9% | 1.9% |
| Period 10 of 2025-26 | 2,572 | 79.1% | 6.0% |
| Period 9 of 2025-26 | 2,591 | 63.6% | 4.2% |
| Period 8 of 2025-26 | 2,568 | 67.1% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Romiley | 36,175 | 87.1% | 2.3% |
| Guide Bridge | 36,082 | 87.6% | 2.1% |
| Wavertree Technology Park | 36,708 | 80.9% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out