London Overground at Romford
How this operator is doing here
London Overground had 22,220 scheduled stops at Romford in the 13 periods to Period 7 of 2026-27, 14% of the station's total. 99.7% of recorded arrivals came within three minutes and 0.4% of stops were cancelled.
London Overground trains at Romford also serve Emerson Park (2.7 km east, – on time, 0.4% cancelled), Upminster (5.1 km east, 99.7% on time, 0.4% cancelled), Barking Riverside (7.7 km south-west, 96.7% on time, 4.0% cancelled), Barking (8.1 km south-west, 94.3% on time, 3.5% cancelled), Woodgrange Park (9.9 km west, 93.8% on time, 3.0% cancelled) and Wanstead Park (11.1 km west, 94.5% on time, 3.1% cancelled), which are the stations on its network closest to Romford.
Within 30 km of here, London Overground runs best at Upminster, 5.1 km east (99.7%), and worst at Finchley Road and Frognal, 25.4 km west (75.2%).
The busiest London Overground station within 30 km of Romford is Highbury and Islington, 20.0 km west, with about 593 scheduled stops a day.
Of the 3 operators with enough records at Romford, London Overground is the most punctual, at 99.7%.
Romford is the most punctual station on the London Overground network, out of 111 ranked stations: 99.7% here against 89.4% across the whole network, which is 10.3 percentage points better.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,720 | 99.9% | 0.0% |
| Period 6 of 2026-27 | 1,720 | 99.8% | 0.4% |
| Period 5 of 2026-27 | 1,720 | 99.5% | 0.3% |
| Period 4 of 2026-27 | 1,720 | 99.8% | 0.8% |
| Period 3 of 2026-27 | 1,720 | 99.9% | 0.1% |
| Period 2 of 2026-27 | 1,712 | 98.1% | 0.4% |
| Period 1 of 2026-27 | 1,976 | 99.8% | 0.1% |
| Period 13 of 2025-26 | 1,518 | 99.7% | 2.0% |
| Period 12 of 2025-26 | 1,720 | 99.8% | 0.0% |
| Period 11 of 2025-26 | 1,720 | 100.0% | 0.2% |
| Period 10 of 2025-26 | 1,582 | 100.0% | 0.4% |
| Period 9 of 2025-26 | 1,674 | 99.9% | 0.2% |
| Period 8 of 2025-26 | 1,718 | 99.9% | 0.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Romford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 118,884 | 88.8% | 2.3% |
| Greater Anglia | 20,605 | 88.2% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out