Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Rogerstone

RORWalesManaged by TfW Rail

On time, last 13 periods87.1%Great Britain: 83.6%
Cancelled3.8%Great Britain: 3.2%
Stops a day55Scheduled, on average
Punctuality rank860th of 2,374Among ranked stations

How this station is performing

Rogerstone had 20,016 scheduled stops to Period 7 of 2026-27, about 55 a day. 87.1% of recorded arrivals were within three minutes of the timetable and 3.8% of scheduled stops were cancelled.

Rogerstone opened on 12 July 1851 and closed to passengers on 30 April 1962. It reopened on 6 February 2008, 18 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Risca and Pontymister is the oldest (1850) and Pye Corner the newest (2014), with Rogerstone in between.

The nearest stations to Rogerstone are Risca and Pontymister (2.1 km north-west), Pye Corner (2.3 km south-east), Newport (South Wales) (4.6 km east), Crosskeys (5.0 km north-west) and Cwmbran (7.7 km north-east). 6 stations lie within 10 km in all. Of the five, Pye Corner is the most punctual at 88.2% and Cwmbran the least at 68.2%, with Rogerstone on 87.1%.

Rogerstone takes its name from a suburb called Rogerstone, home to about 13,898 people, and the station stands 1.0 km from its centre.

1 of 3 stations of a similar size in Wales are more punctual than Rogerstone on 87.1%. The comparison group includes Crosskeys (86.9%), Deganwy (89.0%) and Ebbw Vale Parkway (86.7%).

Period by period

60%80%2023-242024-252025-262026-27Period 7 of 2023-24: 70.5%Period 8 of 2023-24: 69.5%Period 9 of 2023-24: 55.6%Period 10 of 2023-24: 74.9%Period 11 of 2023-24: 83.4%Period 12 of 2023-24: 86.5%Period 13 of 2023-24: 88.3%Period 1 of 2024-25: 85.3%Period 2 of 2024-25: 90.9%Period 3 of 2024-25: 84.8%Period 4 of 2024-25: 84.0%Period 5 of 2024-25: 85.6%Period 6 of 2024-25: 81.5%Period 7 of 2024-25: 84.2%Period 8 of 2024-25: 83.3%Period 9 of 2024-25: 81.1%Period 10 of 2024-25: 79.5%Period 11 of 2024-25: 84.1%Period 12 of 2024-25: 83.5%Period 13 of 2024-25: 87.4%Period 1 of 2025-26: 90.6%Period 2 of 2025-26: 84.5%Period 3 of 2025-26: 87.8%Period 4 of 2025-26: 85.2%Period 5 of 2025-26: 87.9%Period 6 of 2025-26: 88.1%Period 7 of 2025-26: 85.7%Period 8 of 2025-26: 85.7%Period 9 of 2025-26: 81.1%Period 10 of 2025-26: 83.5%Period 11 of 2025-26: 93.0%Period 12 of 2025-26: 91.0%Period 13 of 2025-26: 92.4%Period 1 of 2026-27: 89.5%Period 2 of 2026-27: 88.7%Period 3 of 2026-27: 88.7%Period 4 of 2026-27: 78.6%Period 5 of 2026-27: 81.9%Period 6 of 2026-27: 89.3%Period 7 of 2026-27: 85.3%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 2.3%Period 2 of 2023-24: 4.8%Period 3 of 2023-24: 2.0%Period 4 of 2023-24: 1.6%Period 5 of 2023-24: 0.7%Period 6 of 2023-24: 1.1%Period 7 of 2023-24: 1.7%Period 8 of 2023-24: 0.6%Period 9 of 2023-24: 12.4%Period 10 of 2023-24: 1.2%Period 11 of 2023-24: 1.4%Period 12 of 2023-24: 1.9%Period 13 of 2023-24: 1.7%Period 1 of 2024-25: 1.5%Period 2 of 2024-25: 1.4%Period 3 of 2024-25: 2.5%Period 4 of 2024-25: 4.6%Period 5 of 2024-25: 6.3%Period 6 of 2024-25: 6.7%Period 7 of 2024-25: 5.4%Period 8 of 2024-25: 1.6%Period 9 of 2024-25: 8.0%Period 10 of 2024-25: 9.6%Period 11 of 2024-25: 5.0%Period 12 of 2024-25: 2.4%Period 13 of 2024-25: 2.3%Period 1 of 2025-26: 5.3%Period 2 of 2025-26: 2.6%Period 3 of 2025-26: 2.7%Period 4 of 2025-26: 2.1%Period 5 of 2025-26: 0.4%Period 6 of 2025-26: 2.9%Period 7 of 2025-26: 2.2%Period 8 of 2025-26: 2.5%Period 9 of 2025-26: 4.0%Period 10 of 2025-26: 1.8%Period 11 of 2025-26: 3.0%Period 12 of 2025-26: 3.3%Period 13 of 2025-26: 1.0%Period 1 of 2026-27: 6.2%Period 2 of 2026-27: 6.1%Period 3 of 2026-27: 2.2%Period 4 of 2026-27: 8.3%Period 5 of 2026-27: 8.9%Period 6 of 2026-27: 2.1%Period 7 of 2026-27: 0.8%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Transport for Wales20,01687.1%3.8%

Operators with their own page for this station are linked to it.

Late train at Rogerstone? Delay Repay

These operators call at Rogerstone and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,59585.3%0.8%
Period 6 of 2026-271,42889.3%2.1%
Period 5 of 2026-271,44681.9%8.9%
Period 4 of 2026-271,35778.6%8.3%
Period 3 of 2026-271,48588.7%2.2%
Period 2 of 2026-271,59488.7%6.1%
Period 1 of 2026-271,80889.5%6.2%
Period 13 of 2025-261,70392.4%1.0%
Period 12 of 2025-261,56691.0%3.3%
Period 11 of 2025-261,48693.0%3.0%
Period 10 of 2025-261,36083.5%1.8%
Period 9 of 2025-261,60881.1%4.0%
Period 8 of 2025-261,58085.7%2.5%

Time of year

75%80%85%90%95%P1: 88.4%1P2: 88.2%2P3: 87.0%3P4: 83.1%4P5: 85.3%5P6: 86.4%6P7: 83.7%7P8: 82.3%8P9: 79.5%9P10: 79.9%10P11: 87.0%11P12: 86.9%12P13: 89.4%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in Wales

StationScheduled stopsWithin 3 minCancelled
Crosskeys20,01686.9%3.9%
Deganwy20,01689.0%2.9%
Ebbw Vale Parkway20,01686.7%4.9%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out