Ebbw Vale Parkway
EBVWalesManaged by TfW Rail
How this station is performing
Ebbw Vale Parkway had 20,016 scheduled stops to Period 7 of 2026-27, about 55 a day. 86.7% of recorded arrivals were within three minutes of the timetable and 4.9% of scheduled stops were cancelled.
Ebbw Vale Parkway opened on 6 February 2008, 18 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Tir-Phil is the oldest (1858) and Ebbw Vale Town the newest (2015), with Ebbw Vale Parkway in between.
The nearest stations to Ebbw Vale Parkway are Ebbw Vale Town (2.3 km north), Tir-Phil (5.3 km south-west), Brithdir (5.6 km south-west), Pontlottyn (5.8 km west) and Rhymney (6.4 km west). 9 stations lie within 10 km in all. At 86.7%, Ebbw Vale Parkway is less punctual than all of them; the best of the five, Pontlottyn, manages 91.3%.
Ebbw Vale Parkway is a parkway station, 2.6 km from the centre of Ebbw Vale, a town, home to about 18,558 people, which gives it its name.
Compared with 3 stations of a similar size in Wales, Ebbw Vale Parkway is the least punctual, at 86.7%. All of them are ahead, including Crosskeys (86.9%), Deganwy (89.0%) and Llanhilleth (87.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 20,016 | 86.7% | 4.9% |
Operators with their own page for this station are linked to it.
Late train at Ebbw Vale Parkway? Delay Repay
These operators call at Ebbw Vale Parkway and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,595 | 84.4% | 1.6% |
| Period 6 of 2026-27 | 1,428 | 88.0% | 3.4% |
| Period 5 of 2026-27 | 1,446 | 82.5% | 10.0% |
| Period 4 of 2026-27 | 1,357 | 80.0% | 9.9% |
| Period 3 of 2026-27 | 1,485 | 88.5% | 4.0% |
| Period 2 of 2026-27 | 1,594 | 88.6% | 7.2% |
| Period 1 of 2026-27 | 1,808 | 91.0% | 7.5% |
| Period 13 of 2025-26 | 1,703 | 92.5% | 1.9% |
| Period 12 of 2025-26 | 1,566 | 90.1% | 4.0% |
| Period 11 of 2025-26 | 1,486 | 91.5% | 3.6% |
| Period 10 of 2025-26 | 1,360 | 82.3% | 2.8% |
| Period 9 of 2025-26 | 1,608 | 79.0% | 4.7% |
| Period 8 of 2025-26 | 1,580 | 82.6% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Crosskeys | 20,016 | 86.9% | 3.9% |
| Deganwy | 20,016 | 89.0% | 2.9% |
| Llanhilleth | 20,016 | 87.3% | 4.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out