Crosskeys
CKYWalesManaged by TfW Rail
How this station is performing
Crosskeys had 20,016 scheduled stops to Period 7 of 2026-27, about 55 a day. 86.9% of recorded arrivals were within three minutes of the timetable and 3.9% of scheduled stops were cancelled.
Crosskeys opened on 18 June 1851 and closed to passengers on 30 April 1962. It reopened on 7 June 2008, 18 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Risca and Pontymister is the oldest (1850) and Pye Corner the newest (2014), with Crosskeys in between.
The nearest stations to Crosskeys are Risca and Pontymister (2.9 km south-east), Rogerstone (5.0 km south-east), Newbridge (5.1 km north), Pye Corner (7.3 km south-east) and Hengoed (7.4 km north-west). 16 stations lie within 10 km in all. At 86.9%, Crosskeys is less punctual than all of them; the best of the five, Hengoed, manages 90.1%.
Crosskeys takes its name from a Village called Crosskeys, home to about 3,265 people, and the station stands 0.6 km from its centre.
Across the whole run of data, the weakest four-week period for Crosskeys was Period 9 of 2023-24, at 48.8%, some time before the latest year. The strongest was Period 13 of 2025-26, at 92.0%, and the two are 43.2 percentage points apart. Cancellations peaked at 12.4% of scheduled stops in Period 9 of 2023-24, against 3.9% over the latest 13 periods.
2 of 3 stations of a similar size in Wales are more punctual than Crosskeys on 86.9%. The comparison group includes Deganwy (89.0%), Ebbw Vale Parkway (86.7%) and Llanhilleth (87.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 20,016 | 86.9% | 3.9% |
Operators with their own page for this station are linked to it.
Late train at Crosskeys? Delay Repay
These operators call at Crosskeys and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,595 | 84.8% | 0.8% |
| Period 6 of 2026-27 | 1,428 | 88.0% | 2.1% |
| Period 5 of 2026-27 | 1,446 | 82.3% | 8.9% |
| Period 4 of 2026-27 | 1,357 | 79.4% | 8.3% |
| Period 3 of 2026-27 | 1,485 | 87.4% | 2.2% |
| Period 2 of 2026-27 | 1,594 | 88.6% | 6.1% |
| Period 1 of 2026-27 | 1,808 | 90.4% | 6.3% |
| Period 13 of 2025-26 | 1,703 | 92.0% | 1.1% |
| Period 12 of 2025-26 | 1,566 | 89.7% | 3.3% |
| Period 11 of 2025-26 | 1,486 | 92.0% | 3.0% |
| Period 10 of 2025-26 | 1,360 | 84.0% | 1.8% |
| Period 9 of 2025-26 | 1,608 | 80.9% | 4.1% |
| Period 8 of 2025-26 | 1,580 | 86.9% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Deganwy | 20,016 | 89.0% | 2.9% |
| Ebbw Vale Parkway | 20,016 | 86.7% | 4.9% |
| Llanhilleth | 20,016 | 87.3% | 4.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out