Riddlesdown
RDDLondonManaged by Govia Thameslink Railway (Southern)
How this station is performing
Riddlesdown had 25,875 scheduled stops to Period 7 of 2026-27, about 71 a day. 84.1% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Riddlesdown opened on 5 June 1927, 99 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Riddlesdown is the newest; the oldest, Purley, opened in 1841.
The nearest stations to Riddlesdown are Kenley (0.9 km south), Purley (1.1 km north-west), Purley Oaks (1.6 km north), Reedham (London) (1.7 km west) and Sanderstead (1.8 km north). 51 stations lie within 10 km in all. At 84.1%, Riddlesdown is more punctual than every one of them; the best of the five, Sanderstead, manages 83.6%.
Riddlesdown takes its name from an area of London called Riddlesdown, and the station stands 0.3 km from its centre.
Riddlesdown has slipped a little, from 88.4% within three minutes in the previous 13 periods to 84.1% in the latest 13, a fall of 4.3 percentage points. Cancellations rose to 2.4% of scheduled stops from 1.9%, which is 0.5 percentage points more.
2 of 3 stations of a similar size in London are more punctual than Riddlesdown on 84.1%. The comparison group includes Kenley (66.9%), Turkey Street (92.9%) and Southbury (93.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 25,875 | 84.1% | 2.4% |
Operators with their own page for this station are linked to it.
Late train at Riddlesdown? Delay Repay
These operators call at Riddlesdown and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,034 | 72.7% | 3.3% |
| Period 6 of 2026-27 | 2,041 | 80.8% | 1.8% |
| Period 5 of 2026-27 | 2,050 | 77.8% | 3.9% |
| Period 4 of 2026-27 | 2,052 | 85.7% | 1.5% |
| Period 3 of 2026-27 | 2,010 | 80.4% | 2.0% |
| Period 2 of 2026-27 | 1,814 | 89.8% | 1.3% |
| Period 1 of 2026-27 | 2,320 | 90.9% | 0.8% |
| Period 13 of 2025-26 | 2,175 | 89.2% | 2.3% |
| Period 12 of 2025-26 | 2,020 | 86.2% | 1.8% |
| Period 11 of 2025-26 | 1,795 | 84.2% | 2.9% |
| Period 10 of 2025-26 | 1,760 | 85.4% | 2.8% |
| Period 9 of 2025-26 | 1,868 | 83.0% | 2.8% |
| Period 8 of 2025-26 | 1,936 | 86.0% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kenley | 25,897 | 66.9% | 1.7% |
| Turkey Street | 25,612 | 92.9% | 2.5% |
| Southbury | 25,472 | 93.4% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out