Pye Corner
PYEWalesManaged by TfW Rail
How this station is performing
Pye Corner had 20,016 scheduled stops to Period 7 of 2026-27, about 55 a day. 88.2% of recorded arrivals were within three minutes of the timetable and 3.8% of scheduled stops were cancelled.
Pye Corner opened on 14 December 2014, 12 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Pye Corner is the newest; the oldest, Newport (South Wales), opened in 1850.
The nearest stations to Pye Corner are Rogerstone (2.3 km north-west), Newport (South Wales) (2.9 km east), Risca and Pontymister (4.4 km north-west), Crosskeys (7.3 km north-west) and Cwmbran (8.6 km north). 5 stations lie within 10 km in all. At 88.2%, Pye Corner is more punctual than every one of them; the best of the five, Risca and Pontymister, manages 87.3%.
Across the whole run of data, the weakest four-week period for Pye Corner was Period 9 of 2023-24, at 54.3%, some time before the latest year. The strongest was Period 11 of 2025-26, at 93.6%, and the two are 39.3 percentage points apart. Cancellations peaked at 11.6% of scheduled stops in Period 9 of 2023-24, against 3.8% over the latest 13 periods.
1 of 3 stations of a similar size in Wales are more punctual than Pye Corner on 88.2%. The comparison group includes Crosskeys (86.9%), Deganwy (89.0%) and Ebbw Vale Parkway (86.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 20,016 | 88.2% | 3.8% |
Operators with their own page for this station are linked to it.
Late train at Pye Corner? Delay Repay
These operators call at Pye Corner and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,595 | 86.6% | 0.8% |
| Period 6 of 2026-27 | 1,428 | 89.4% | 2.1% |
| Period 5 of 2026-27 | 1,446 | 83.3% | 8.6% |
| Period 4 of 2026-27 | 1,357 | 80.6% | 8.3% |
| Period 3 of 2026-27 | 1,485 | 89.7% | 2.1% |
| Period 2 of 2026-27 | 1,594 | 89.7% | 6.1% |
| Period 1 of 2026-27 | 1,808 | 90.2% | 6.2% |
| Period 13 of 2025-26 | 1,703 | 92.2% | 1.0% |
| Period 12 of 2025-26 | 1,566 | 92.2% | 3.3% |
| Period 11 of 2025-26 | 1,486 | 93.6% | 3.0% |
| Period 10 of 2025-26 | 1,360 | 85.1% | 1.8% |
| Period 9 of 2025-26 | 1,608 | 83.3% | 4.0% |
| Period 8 of 2025-26 | 1,580 | 87.7% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Crosskeys | 20,016 | 86.9% | 3.9% |
| Deganwy | 20,016 | 89.0% | 2.9% |
| Ebbw Vale Parkway | 20,016 | 86.7% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out